Wuhui Electric Machinery Engineering Co., Ltd., DongguanVIP

空调安装、空调维修、空调销售、机电工程、中央空调、热泵、水电安装、管道安装工程、净化工程、热水工程
Enter Shop

Electrical and Waterworks Construction

平台认证
  • Unit Price

    Negotiable

  • Brand

    Weibang

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



东莞市伟邦机电工程有限公司

VIP   数字营销第3年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Weibang

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0square meters

  • Address:

    GuangdongDongguan

  • Delivery:

    3days

  • View More

Description

Develop electrical and plumbing construction drawings: Based on the designer's plan, the electrical and plumbing engineer creates construction drawings for electrical and plumbing work, determining the layout and installation locations of pipelines.

2. Pipeline Layout: Workers mark the locations and lengths of water and electricity pipelines on walls and floors according to the construction drawings, determining the length, bend angle, and connection method for each pipe.

3. Install embedded pipes: Construction workers install the pre-buried pipes according to the plumbing and electrical drawings, securing them to the walls and ground.

4. Installation of Water and Electrical Equipment: After the piping is completed, the construction crew begins to install water and electrical equipment and appliances.

5. Pipe Connections: After the installation of the pipeline and equipment is completed, the construction crew commences the pipe connection work.

6. Conduct electrical and water tests: After the installation and connection of the water and electrical pipelines, the construction team performs electrical and water tests, including water pipe pressure tests, water meter tests, and electrical wire tests.

7. Tidy up plumbing and electrical lines: After testing, the construction crew will organize the plumbing and electrical lines.

8. Defect Repair: During the construction process, if there are issues such as plumbing or electrical piping not meeting specifications or existing defects, the construction personnel must promptly repair them.

9. Completion and Acceptance Inspection: After the completion of water and electricity installation, conduct a completion and acceptance inspection to check if the quality and safety of the water and electricity project meet the requirements. Any non-compliance should be rectified promptly.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery GuangdongDongguan3dayswithin
Brand Weibang
Type Electrical and plumbing installation
Customized Processing Is
Installation Method In-home installation
Expiry Long Valid
Update 2023-09-25 09:15
Gallery

Wuhui Electric Machinery Engineering Co., Ltd., DongguanPublished byElectrical and Waterworks ConstructionGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top