Wuhan Weibang Electrical and Mechanical Engineering Co., Ltd.VIP

空调安装、空调维修、空调销售、机电工程、中央空调、热泵、水电安装、管道安装工程、净化工程、热水工程
Enter Shop

Electrical and plumbing installation project contracting

平台认证
  • Unit Price

    Negotiable

  • Brand

    Weibang

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



东莞市伟邦机电工程有限公司

VIP   数字营销第3年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Weibang

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0square meters

  • Address:

    GuangdongDongguan

  • Delivery:

    3days

  • View More

Description

Develop electrical and water installation plans: Based on the designer's scheme, the electrical and water engineer creates installation plans, determining the layout and installation locations of the piping.

2. Pipeline Layout: Based on the electrical and plumbing construction drawings, workers mark the positions and lengths of water and electrical pipelines on walls and floors, determining each pipe's length, bend angle, and connection method.

3. Install embedded pipes: Workers install the embedded pipes into walls and floors according to the plumbing and electrical drawings.

4. Installation of Water and Electrical Equipment: After the piping is completed, the construction crew begins installing water and electrical equipment and appliances.

5. Pipeline Connection: After the installation of the pipeline and equipment is completed, the construction crew begins the pipeline connection work.

6. Conduct water and electricity tests: After the installation and connection of water and electricity pipes are completed, the construction team performs water and electricity tests, including water pipe pressure tests, water meter tests, and wire tests.

7. Tidy up water and electrical piping: After testing, the construction crew will organize the water and electrical piping.

8. Defect Rectification: During the construction process, if there are issues such as water and electrical pipeline installations not meeting requirements or existing defects, the construction personnel must promptly carry out repairs.

9. Final Acceptance Inspection: After the completion of water and electricity construction, conduct a final acceptance inspection to check if the quality and safety of the water and electricity project meet the requirements. Any discrepancies should be addressed promptly.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery GuangdongDongguan3dayswithin
Brand Weibang
Type Electrical and plumbing installation
Customized Processing Is
Installation Method On-site installation
Expiry Long Valid
Update 2023-09-25 09:15
Gallery

Wuhan Weibang Electrical and Mechanical Engineering Co., Ltd.Published byElectrical and plumbing installation project contractingGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top