Wuhan Weibang Electromechanical Engineering Co., Ltd.VIP

空调安装、空调维修、空调销售、机电工程、中央空调、热泵、水电安装、管道安装工程、净化工程、热水工程
Enter Shop

Electrical and plumbing installation project

平台认证
  • Unit Price

    Negotiable

  • Brand

    Weibang

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



东莞市伟邦机电工程有限公司

VIP   数字营销第3年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Weibang

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0square meters

  • Address:

    GuangdongDongguan

  • Delivery:

    3days

  • View More

Description

1. Develop Electrical and Water Installation Drawings: Based on the designer's plan, the electrical engineer creates the electrical and water installation drawings, determining the layout and installation locations of the piping.

2. Pipeline Layout: Workers mark the positions and lengths of water and electricity pipelines on walls and floors according to the construction drawings, determining the length of each pipe, bend angle, and connection method.

3. Install embedded pipes: Construction workers will install the embedded pipes onto the walls and ground according to the plumbing and electrical plans.

4. Installation of Water and Electrical Equipment: After the pipeline installation is completed, the construction crew begins to install water and electrical equipment and appliances.

5. Pipeline Connection: After the installation of the pipeline and equipment is completed, the construction crew begins the pipeline connection work.

6. Conduct electrical and water tests: After the installation and connection of water and electrical pipelines, the construction crew performs electrical and water tests, including pipe pressure tests, water meter tests, wire tests, etc.

7. Organize plumbing and electrical conduits: After testing, the construction crew arranges the plumbing and electrical conduits.

8. Defect Repair: During the construction process, if there are issues such as plumbing or electrical pipeline installations not meeting the requirements or defects, the construction personnel must promptly carry out repairs.

9. Completion and Acceptance Inspection: After the completion of water and electricity installation, conduct a completion and acceptance inspection to verify if the quality and safety of the water and electricity project meet the requirements. Any non-compliant areas should be rectified promptly.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery GuangdongDongguan3dayswithin
Brand Weibang
Type Electrical and plumbing installation
Custom Processing & Tailoring Is
Installation Method On-site Installation
Expiry Long Valid
Update 2023-09-25 09:15
Gallery

Wuhan Weibang Electromechanical Engineering Co., Ltd.Published byElectrical and plumbing installation projectGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top