Wujiang Weibang Electromechanical Engineering Co., Ltd., DongguanVIP

空调安装、空调维修、空调销售、机电工程、中央空调、热泵、水电安装、管道安装工程、净化工程、热水工程
Enter Shop

Water and electricity renovation project

平台认证
  • Unit Price

    Negotiable

  • Brand

    Weibang

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



东莞市伟邦机电工程有限公司

VIP   数字营销第3年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Weibang

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0square meters

  • Address:

    GuangdongDongguan

  • Delivery:

    3days

  • View More

Description

1. Develop Electrical and Water Installation Plans: Based on the designer's scheme, the electrical and water engineer creates installation plans, determining the layout and installation locations of water and electrical piping.

2. Pipeline Layout: Based on the electrical and water installation drawings, workers mark the locations and lengths of the water and electrical pipelines on walls and floors, determining the length of each pipe, bend angles, and connection methods.

3. Install embedded pipes: Construction workers install the embedded pipes onto the walls and ground according to the electrical and water drawings.

4. Installation of Water and Electricity Equipment: After the piping is completed, the construction crew begins to install water and electricity equipment and appliances.

5. Pipeline Connection: After the installation of the pipeline and equipment is completed, the construction crew begins the pipeline connection work.

6. Conduct electrical and water tests: After the installation and connection of water and electrical pipelines, the construction crew performs electrical and water tests, which include water pipe pressure tests, water meter tests, and electrical wire tests, etc.

7. Tidy Up Plumbing and Electrical Lines: After testing, the construction crew will organize the plumbing and electrical lines.

8. Defect Repair: During construction, if there are issues such as plumbing or electrical pipe work not meeting specifications or defects, the construction crew must promptly address and repair them.

9. Completion Inspection: Upon completion of the electrical and plumbing work, conduct a final inspection to ensure the quality and safety of the project meet requirements. Any discrepancies must be corrected promptly.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery GuangdongDongguan3dayswithin
Brand Weibang
Type Electrical and plumbing installation
Customized Processing Is
Installation Method On-site Installation
Expiry Long Valid
Update 2023-09-25 09:15
Gallery

Wujiang Weibang Electromechanical Engineering Co., Ltd., DongguanPublished byWater and electricity renovation projectGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top