Wujiang Weibang Electromechanical Engineering Co., Ltd.VIP

空调安装、空调维修、空调销售、机电工程、中央空调、热泵、水电安装、管道安装工程、净化工程、热水工程
Enter Shop

Factory electrical and water installation

平台认证
  • Unit Price

    Negotiable

  • Brand

    Weibang

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



东莞市伟邦机电工程有限公司

VIP   数字营销第3年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Weibang

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0square meters

  • Address:

    GuangdongDongguan

  • Delivery:

    3days

  • View More

Description

1. Develop Electrical and Waterworks Construction Drawings: Based on the designer's plan, the electrical and waterworks engineer drafts construction drawings for electrical and waterworks systems, determining the pipeline layout and installation locations.

2. Pipeline Layout: Construction personnel mark the positions and lengths of water and electricity pipelines on walls and floors according to the construction drawings, determining the length of each pipe, bend angles, and connection methods.

3. Install embedded pipes: Construction workers install the pre-buried pipes according to the electrical and water plans, placing them in walls and on the ground.

4. Installation of Electrical and Water Supply Equipment: After the piping is completed, the construction crew begins the installation of electrical and water supply equipment and appliances.

5. Pipeline Connection: After the installation of pipelines and equipment is completed, construction workers begin the pipeline connection work.

6. Conduct electrical and water tests: After the installation and connection of water and electricity pipelines, the construction crew performs electrical and water tests, including water pipe pressure tests, water meter tests, and wire tests, etc.

7. Tidy up plumbing and electrical systems: After testing, the construction crew will organize the plumbing and electrical pipes.

8. Defect Repair: During the construction process, if there are issues such as water and electricity pipeline installation not meeting requirements or existing defects, the construction personnel must promptly carry out repairs.

9. Final Inspection and Acceptance: After the completion of water and electricity installation, conduct a final inspection to ensure the quality and safety of the project meet the requirements. Any non-compliant areas must be rectified promptly.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery GuangdongDongguan3dayswithin
Brand Weibang
Type Electrical and plumbing installation
Customized Processing Is
Installation Method On-site installation
Expiry Long Valid
Update 2023-09-25 09:15
Gallery

Wujiang Weibang Electromechanical Engineering Co., Ltd.Published byFactory electrical and water installationGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top