Outdoor floor cutting and removalMethod:
1. Cut into pieces not exceeding 500kg each, and then offload the concrete blocks to the next level or onto the ground.
2. Based on the design drawings, determine the cutting area. First, mark the required cutting edges on the floor surface with a marking pen, then, according to the lifting equipment, determine the floor's modular size, approximately 1.5m x 1.5m.
3. Clear the cutting area site, including removing ground structures and decorative debris, as well as various pipes affecting the cutting process (air ducts, electrical conduits, rainwater pipes, etc.).
4. Before cutting the main structure floor, use a steel beam crane to hoist, with the hoist securely fastened to the beams.
On the floor to be cut, drill four holes evenly using a drill machine, thread through steel wire ropes, then hang them on the hooks of two hand winches. The concrete cutting winch is suspended on the hoist frame.
Tighten the hand winch to ensure full tension.
6. Utilize reinforced concrete cutting machines, with dedicated personnel for construction guidance.
7.HuhhotAfter outdoor floor cutting and demolition work, the cut floorboards are gently lowered to the lower level or ground using two hand winches.