


The equipment utilizes a thermal oil heating system to preliminarily melt the lump asphalt, then employs fire tubes for intensive heating to bring the asphalt to pumping temperature before transporting it to the asphalt storage tank.
1. The equipment's dimensions are designed for a 40-foot high cube container, allowing for ocean shipping with just one 40-foot high cube container.
2. The upper hoisting brackets are all connected with bolts and are removable, making them easy for site relocation and international shipping.
3. The initial asphalt melting uses heat transfer oil to prevent safety accidents.
4. The equipment comes with an integrated heating unit, eliminating the need for external connections. Simply provide power to start operating.
5. The equipment features a one-heating warehouse and three melting chambers, enhancing asphalt melting speed and production efficiency.






























