Guangzhou Heze Air Conditioning Equipment Installation Engineering Co., Ltd.VIP

水冷螺杆机 格力天花机 格力中央空调 格力直流变频多联机 格力多联机 格力风冷模块机
Enter Shop

格力 Large Air-Cooled Chiller Design,格力 Water-Cooled Screw Chiller Sales & Installation, Guangzhou Heze Air Conditioning

平台认证
  • Unit Price

    Negotiable

  • Brand

    Gree

  • MOQ

    1Tai

Contact
Leave Msg

Platform Service

Supplier Verified



广州和泽空调设备安装工程有限公司

VIP   数字营销第4年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    Gree

  • Unit Price:

    Negotiable

  • MOQ:

    MOQ1Tai

  • Total:

    10Tai

  • Address:

    GuangdongGuangzhou

  • Delivery:

    Pre-sale, after payment45days

  • View More

Description

The Gree Full-liquid Water-Cooled Screw Chiller adopts the new-generation environmentally friendly refrigerant R134a, ensuring stable and reliable operation, as well as energy conservation and environmental protection. The cooling capacity range under nominal conditions is: 182-1560KW, and it is widely applicable to various office buildings, schools, and shopping malls, as well as for temperature reduction in production processes.

 

One. Gree Central Air Conditioning – Product Features

 

1. Gree Central Air Conditioning - High Energy Efficiency

● Gree Central Air Conditioner - Full Liquid Evaporation Technology

The refrigerant distribution in the evaporator is more uniform, optimizing the temperature field for higher heat exchange efficiency; the full liquid evaporator significantly increases the evaporation temperature of the unit, enhancing its heat exchange efficiency. Paired with a high-performance, high-reliability screw compressor, it greatly boosts the refrigeration capacity and energy efficiency of the unit.
Efficiency Ratio.


● Gree Central Air Conditioning - New Throttling Method

Automatically calculates the energy efficiency ratio, rapidly adjusts the actual value as needed, and outputs accordingly, further optimizing the control logic.
Electronic expansion valve for more accurate adjustment of refrigerant flow and evaporator liquid level changes
The unit's partial load efficiency consistently remains high, with an expanded operating range.


 

● Gree Central Air Conditioning - Higher efficiency in multi-machine parallel operation and part load

Due to the majority of operating time being outside of the designed conditions, attention should be paid when selecting a chilled water unit.
It must not only meet full-load design requirements but also operate at lower loads and when the cooling tower water temperature is lower. For chillers with the same full-load energy efficiency ratio, the operating costs at part-load can sometimes differ by more than 10%.
Partial Load Integrated Value (IPLv) truly and effectively reflects the performance indicator under partial load. Gree's full-liquid multi-machine parallel technology allows for dual-machine parallel operation, as well as single-machine independent operation, with higher efficiency during partial load operation.


 

● Gree Central Air Conditioning - Capacity Adjustment and Unit Load Matching

Available for adjustable capacity, stepless or stepped, as per customer requirements.

The compressor starts at low load position and can be infinitely adjusted for cooling capacity.

Continuous sliding gate regulation for forced gas input, perfectly matching the actual load.

 

2. Gree Central Air Conditioning - High Reliability

 

◆ Reliable Return Oil System

Specifically designed for flooded-type chillers, it features low-oil level protection control, completely eliminating the possibility of compressor damage due to insufficient oil.
A combination of mechanical and adsorption separation for primary and secondary oil separation ensures effective oil separation.


● Rigorous experimental procedures

During online screw unit inspections, we utilize an industry-standard online inspection system (developed by the Fertilizer Machinery Research Institute, featuring a barcode management system and a super-large online inspection system with computerized automatic detection and judgment).

 

3. Gree Central Air Conditioning - Eco-friendly

This series of full-liquid water-cooled screw chiller units utilizes the environmentally friendly refrigerant R134A, which is widely recognized in the industry as a green refrigerant, contributing to comfortable and eco-friendly living.

 

Section 2: Gree Central Air Conditioning - Control System

 

1. Color Image Display Control Center(彩色 touch screen is optional)

 

● Gree Central Air Conditioning - Advanced Control Platform


The control system utilizes high-performance CPUs and DSP digital signal processors, ensuring excellent real-time performance and precise control accuracy with its data acquisition and processing capabilities.

●Advanced control algorithms


Employed advanced control algorithms to ensure the system has faster response times and better steady-state performance.


 

● Gree Central Air Conditioning - Gree Commercial Large Unit Monitoring Center

One, receive and confirm debugging data for large-scale units (centrifugal machines, screw machines, etc.), ensuring the units are delivered to the customer in a reliable condition.
Regularly conduct random inspections on large equipment within the maintenance period to promptly understand the equipment's operating status. Analyze fault causes through monitoring data and provide timely warnings for potential air conditioning failures, effectively reducing or eliminating the occurrence of faults.
Three: Receive fault alarm prompts from unvisited units, ensuring timely transmission of fault information and effective handling of after-sales issues.
Four, equipped with maintenance and repair information SMS alerts to remind users to timely maintain the equipment, reducing unnecessary equipment failures.


● Gree Central Air Conditioning - Central Control Center

The central control center can intelligently control chilled water systems, electric butterfly valves for chilled water systems, cooling water pumps, chilled water pumps, cooling tower electric butterfly valves, supply/return water temperatures of the main chilled water pipeline, expansion tank liquid levels, pressure difference bypass valves, and more. It automatically adjusts the operation of pumps, cooling towers, and chilled water systems based on the load changes of terminal equipment, aiming to keep the entire machine room system running in an energy-saving state, ultimately achieving an unmanned machine room.
The centralized control center can monitor the operational status of equipment in the server room, featuring self-diagnosis and on-site diagnosis capabilities, displaying relevant system operational conditions and alarm information. The centralized control center is equipped with an excellent Chinese human-machine interface, providing various alarms and textual displays.
The centralized control center can automatically start and shut down, initiate backup equipment in case of equipment damage, and implement protective measures to ensure the safe operation of the entire system.
The centralized control center can immediately read parameters such as the operating load and temperature of the chilled water unit, allows setting operation passwords with different permission levels, and has the function of automatically storing fault information and parameter settings.
Intelligent control system interface, compatible with international brand manufacturers' BAs intelligent systems for communication (equipped with RS485 interface).

 

● Gree Central Air Conditioning - Remote Control Center

Gree's screw compressor unit remote monitoring/BMS interface kit, developed using the internationally popular Modbus communication protocol and the universally applicable Internet communication interface standards, allows our products to seamlessly integrate with customers' existing building systems, enabling an intelligent monitoring system. Additionally, for buildings without a building management system, we offer our independently developed monitoring software, facilitating intelligent management of the customers' air conditioning systems.


● Color Touch Screen LCD Display

The full-Chinese LCD touch screen with a large display offers a more user-friendly human-machine interface, featuring various display methods such as text, images, tables, and curves. It can record and display the operating status of the unit, sensor statuses, valve statuses, and operating parameters from multiple angles, enabling effective monitoring of the unit.


● Download Aircraft Operating Data

Event logs for unit operation, curve record information. Can be downloaded to a USB flash drive via the touch screen USB port, convenient for owners to check the air conditioner's operating status and perform unit maintenance.

 

Section 3: Gree Central Air Conditioning - Product Installation

 

1. Installation Foundation & Environment

Installation Environment

◆ The crew should avoid approaching fire sources and flammable materials. When installed alongside heat sources such as boilers, sufficient attention should be paid to the effects of heat radiation.
Select a location with room temperature below 45°C and good ventilation. Outdoor or open-air installation and storage are prohibited, as well as installation in environments with corrosive gases.
Choose a location with minimal dust.
The site should have good natural lighting for maintenance and inspection.
◆ To meet the needs for maintenance, inspection, and cleaning of the heat exchange tubes in evaporators and condensers, there must be sufficient tube removal space on either end of the unit, which should be comparable in length to the evaporator and condenser of the unit.
◆ For easy machinery lifting and maintenance, adequate space for installation, operation, and repair of the unit should be provided.
The equipment and the entire room should be fully drainable.

Gree Central Air Conditioning – Installation Foundation

The installation foundation for the unit must be made of concrete or steel structure, capable of supporting the operating weight of the machine, and the upper surface must be level. A drainage channel should be reserved for the installation foundation of the unit.
Refer to the installation foundation diagram of the reference unit and accurately place it on the foundation.
◆ Steel plates and vibration-damping pads are to be installed and seated together with the anchor bolts before secondary grouting. The anchor bolts are typically installed with about 100mm protruding above the installation surface.

 


Engineered Unit Name

A(mm)

B(mm)

D(mm)

M(mm)

K(mm)

LSBLG180H/Nb

3160

1350

1150

2630

740

LSBLG210H/Nb

3160

1350

1150

2630

740

LSBLG240H/Nb

3160

1350

1150

2630

740

LSBLG300H/Nb

3160

1600

1400

2630

920

LSBLG340H/Nb

3160

1600

1400

2630

920

LSBLG380H/Nb

3160

1600

1400

2630

920

LSBLG450H/Nb

3160

1720

1520

2630

1100

LSBLG500H/Nb

3160

1720

1520

2630

1100

LSBLG580H/Nb

3160

1720

1520

2630

1100

LSBLG640H/Nb

3160

1720

1520

2630

1100

LSBLG680H/Nb

3400

1900

1700

2830

1210

LSBLG760H/Nb

3400

1900

1700

2830

1210

LSBLG880H/Nb

3900

2000

1900

3330

1420

LSBLG1000H/Nb

3900

2000

1900

3330

1420

LSBLG1160H/Nb

3900

2000

1900

3330

1420

LSBLG1280H/Nb

3900

2000

1900

3330

1420

LSBLG1400H/Nb

4400

2100

1900

3830

1420

LSBLG1500H/Nb

4400

2100

1900

3830

1420

 

2. Gree Central Air Conditioning - External Dimensions and Connection Sizes


Mark

Name

Mark

Name

1

Electrical Control Box

5

Cooling water inlet

2

Screw compressor

6

Cooling water outlet

3

Evaporator

7

Chilled water inlet

4

Condenser

8

Chilled water outlet

 

3. Gree Central Air Conditioning - Installation & Maintenance Space

Leave space for equipment installation and operation.

(2) The installation location of the unit should ensure that the machine is protected from direct sunlight and rain; it should be as free as possible from the effects of fire, flammable materials, corrosive gases, or exhaust fumes; ventilation space should be provided; appropriate measures should be taken to minimize noise and vibration as much as possible.

 


Engineered Unit Name

A

B

C

D

H

LSBLG180H/Nb

600

600

2600

1000

500

LSBLG210H/Nb

600

600

2600

1000

500

LSBLG240H/Nb

600

600

2600

1000

500

LSBLG300H/Nb

600

600

2600

1000

500

LSBLG340H/Nb

600

600

2600

1000

500

LSBLG380H/Nb

600

600

2600

1000

500

LSBLG450H/Nb

600

600

2600

1000

500

LSBLG500H/Nb

600

600

2600

1000

500

LSBLG580H/Nb

600

600

2600

1000

500

LSBLG640H/Nb

600

600

2600

1000

500

LSBLG680H/Nb

600

600

3000

1000

500

LSBLG760H/Nb

600

600

3000

1000

500

LSBLG880H/Nb

600

600

3000

1000

500

LSBLG1000H/Nb

600

600

3500

1000

500

LSBLG1160H/Nb

600

600

3500

1000

500

LSBLG1280H/Nb

600

600

4000

1000

500

LSBLG1400H/Nb

600

600

4000

1000

500

LSBLG1500H/Nb

600

600

4000

1000

500

 


4. Gree Central Air Conditioning - Unit and External Field Wiring Instructions

(1) General Principles


All on-site supplied cables, equipment, and wiring, as well as cable joints and equipment, must comply with various regulations and engineering requirements for use.
All on-site wiring connections must be performed by a licensed electrician.
◇Ensure power is disconnected before proceeding with wiring work.
◇Installer is responsible for any damage caused by incorrect connections of external wiring of the unit.


(2) Power cable connection to the control box of the pump assembly


The external power distribution cabinet must be equipped with circuit breakers to disconnect the power supply to the control box of the unit.
The power cable must be routed through conduits or cable trays.
◇When connecting power cables to the electrical control box of the unit, rubber or plastic protection must be used to prevent scratching from the sheet metal edges.
The power cables near the electrical control box must be securely fastened to prevent any external force from affecting the power terminal board of the electrical control box.
◇ Must be properly grounded.



Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery GuangdongGuangzhouPre-sale, after payment45dayswithin
Stock 10TaiMOQ1Tai
Brand Gree
Cooling capacity 372 kW
Cooling Power 61.1 kW
COP 6.09
Expiry Long Valid
Update 2023-03-07 14:49
Gallery

Guangzhou Heze Air Conditioning Equipment Installation Engineering Co., Ltd.Published by格力 Large Air-Cooled Chiller Design,格力 Water-Cooled Screw Chiller Sales & Installation, Guangzhou Heze Air ConditioningGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top