Installation specifications for monitoring poles:
1. The reinforcement cage for the foundation of the monitoring pole should be temporarily secured, ensuring the top plate of the foundation is level. This means measuring vertically in two directions with a level, observing that the bubble must be centered. The concrete pouring for the foundation of the embedded parts of the upright pole must be compact, and hollow concrete is strictly prohibited.
2. During construction, the pipe openings should be sealed with plastic paper or other materials in advance to prevent concrete from leaking into the embedded pipes during pouring, which may cause blockages. After the foundation is poured, the foundation surface must be elevated 5MM to 10MM above the ground level. Concrete must be cured for a period of time to ensure it reaches a certain installation strength.
3. Each metal upright must be grounded with a resistance less than 4 ohms; the specific data for the bases of the uprights should be determined according to the on-site construction requirements.

Selection Criteria:
1. boasts a high-quality main shaft. Generally, good surveillance poles are made of high-quality seamless steel pipes for the main shaft, which offers enhanced compressive strength. Therefore, it's crucial to check the material of the main shaft when purchasing surveillance poles.
2. Features a thicker wall. Generally, better uprights have thicker walls, as thicker walls enhance the product's wind resistance and load-bearing capacity. Therefore, it's essential to understand the wall thickness when making a purchase.
3. Features easy installation. Generally, good products have flexible installation options. Only by making the operation simpler than that of regular monitoring poles can we offer a better user experience, thereby enhancing competitiveness.