Offer consulting services for optimization (including structural process optimization, structural result optimization, excavation pit optimization, underground construction scheme design optimization, energy-saving optimization, and detailed drawing review, etc.).
Enhanced route
1. Increase the volume of profitable Grade A construction projects, enhancing the company's net profits.
2. Increase the revised engineering quantities for high-unit-price project investments, generating profit through the difference between the contract unit price and the actual cost unit price.
3. Revise some items with unreasonable unit price settings. The specific optimizations will be comprehensively considered based on facility revision plans, on-site conditions, local environment, and resource status.
The optimization of the overall construction plan refers to revising the construction plan based on the implementation of the construction organization, and changing the overall construction plan of a specific project. The optimization of the overall construction plan is a rational combination of production elements such as materials, equipment, labor, construction methods, and environmental conditions.
Revamped plans for large-scale construction measures, optimizing the transformation and revision of existing structures like foundations, supports, and molds, along with the innovation of "four new" technologies, their widespread adoption, and the creative labor that brings substantial economic benefits to enterprises.
Primarily, it refers to the optimization of facility revisions based on the revision of construction technology facilities in the existing structure and various auxiliary construction facilities. During its implementation, it aims to reduce material usage, simplify operational complexity, decrease labor intensity, save working hours, and enhance efficiency. For example, optimizations include the correction of the encasement exposure setting for cast-in-place beams, the correction of the suspension setting for suspended beams, and the correction of the lining turnstile setting, etc.