Our company undertakes dismantling services.Recycled large-scale chemical plants, oil refineries, oil mills, cement factories, fertilizer factories, food additive plants, breweries, electronic factories, manufacturing facilities, etc.*Factory, Food Factory, Small Scale Chemical Plant, Starch Factory, Beverage FactoryWait a minute.Petroleum & chemical industry oil tank dismantling hazardous waste treatment, construction and dismantling of petroleum & chemical projects. High priceRemoveDemolition, relocation, and installation services for large-scale refineries, oil mills, fat factories, cement plants, fertilizer factories, and food additive factories.Various manufacturersProcessing Equipment, Production Line Equipment, Winery Brewing, Starch Factory Equipment, Alkali Factory Equipment, Salt Factory Equipment, Xylitol Production Line*Extract production line equipment, monosodium glutamate factory equipment, chicken essence factory equipment, dairy factory equipment, milk powder factory equipment, starch sugar factory equipment, factory equipment, coal washing plant equipment, alcohol factory equipment, oil factory equipment, citric acid factory equipment, pigment factory equipment. Juice factory equipment, yeast factory equipment, wastewater treatment equipment, sludge treatment equipment, biodiesel plant equipment, brewery equipment, dairy equipment, etc. - idle equipment company undertakes various demolition and relocation projects year-round.。

Our company strictly ensures safety in accordance with procedures: 1. The basis for compilation includes on-site surveys, considering construction safety and progress, and combining past experience in similar projects, a special construction organization design is prepared. 2. Overview of the building to be demolished: 1) Structure: brick and concrete structure. 3. Composition of the construction organization. Demolition work is organized with a plan under the direct guidance of the owner to ensure that the safety and quality of the demolition project meet the target requirements. Technical leaders, construction personnel, safety supervisors, and others are organized for construction management, and they must follow arrangements and commands to ensure safe production. 4. Preparations for house demolition construction: 1) Technical preparation: (1) Information on the buildings and facilities in the area of the house demolition project. Understand the structure, construction, and water, electricity, and pipeline conditions of the building. (2) Study relevant specifications and safety technical documents. (3) Provide safety technical education to construction personnel entering the site. 2) On-site preparation: (1) Before construction, carefully check whether the cutting and relocation of various external power lines affecting the safe construction of the house demolition project are completed, and confirm safety before proceeding. Clear away materials and equipment within the collapse area of the building to be demolished. (2) Clear transportation routes, connect temporary power sources for construction. (3) Cut off water and electricity to the building to be demolished. (4) Display public safety notices to surrounding residents and set caution signs in the dangerous demolition area. 5. House demolition construction process: 1) Construction sequence: (1) This project uses manual tools for manual building demolition, and the construction sequence should be from top to bottom, layer by layer, following the principle of removing non-load-bearing structures first and then load-bearing structures. (2) Exposed components such as eaves, balconies, canopies, and external stairs, which are prone to instability during demolition, should be removed first. (3) Demolition of frame structure buildings must be carried out in the order of floor slabs, secondary beams, soil beams, and columns. The removal of building components such as railings, stairs, and floor slabs should be coordinated with the overall demolition progress of the building structure and should not be removed first. (4) The load-bearing beams and columns of the roof should be removed only after all the components they support have been removed. 2) Leave a work passage: The construction site of the demolition project must have a work passage for the passage of transportation vehicles. Non-work passages should be separated by warning belts and signboards. 3) Floor removal (including flat roofs): The following requirements should be met: (1) After the floor is beaten and crushed, the steel mesh should be temporarily retained and cut off before cutting the beams. (2) Holes can be drilled on each floor slab to set up garbage wells. 4) Secondary beam removal: Cut a 0.1m wide cutting seam at both ends of the beam, cut the end reinforcement (first the lower layer, then the upper layer), causing the secondary beam to naturally tilt towards the other end. After the other end is cut, cut the other end reinforcement (first the upper layer, then the lower layer), and use ropes to lower the secondary beam to the lower layer and break it. 5) Column removal should be carried out in the following sequence: To prevent the impact force of the column collapse from damaging the structure, the direction of the column collapse should be chosen at the position of the lower beam or wall. Strip the reinforcement from the cutting section of the column, cut the reinforcement in the opposite direction and the construction reinforcement on both sides, and pull the column in the collapse direction. 6. Safety precautions during construction: 1) Demolition machinery for house removal should be under the command of a designated person and strictly follow the one-machine-one-person system. 2) Vertical cross-method house demolition construction is prohibited. If a house needs to be overturned for removal, the distance between the overturning object and adjacent buildings or structures must be 1.5 times the height of the object to be removed. 3) For buildings undergoing partial demolition, the retained sections must be reinforced before the demolition. 4) A designated person must monitor the structural condition of the house to be demolished during construction. When an unstable trend is found, the work must be stopped, and effective measures must be taken to eliminate hazards. 5) Various materials removed should be cleared up promptly, sorted, and not thrown down from heights arbitrarily, and should be cleared away promptly. 6) Demolition construction should be carried out in sections, and vertical cross operations are not allowed. Holes on the working surface should be sealed. 7) It is strictly forbidden to gather many people or stack materials on the floor. 8) When removing crossbeams, ensure effective control of their descent before cutting the steel at both ends and slowly lowering them one end at a time. 9) When removing columns, cut out the reinforcement at the bottom of the column, use a manual winch to pull in the direction of collapse, and use gas welding to cut the two sides of the column reinforcement, retaining the reinforcement in the direction of traction.

Petroleum & chemical industry tank dismantling and hazardous waste disposal, construction project dismantling services. High price.DisassembleDemolition, relocation, and installation services for large-scale refineries, oil mills, fat factories, cement plants, fertilizer factories, and food additive plants.RemoveRecycled chemical plant, electronics factory, brewery, cement plant, power plant, machinery and electrical factory*Factory: Steel mill, Fertilizer plant,Demolish chemical plant, electronics factory, brewery, cement factory, power plant, machinery and electrical factory*Factory FoodFactory, our company ownsChemical factoryRemoveQualified to undertake chemical plant projects,Various factoriesRemove。































