Thermal Snow Melting Cable by SIM_SupplyPro Co., Ltd._Wuxi Global Electrical Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Wuxi Global Electrical Equipment Co., Ltd.

Electric Trace Heating, Skin Heating Cable, MI Heating Cable, Various Electri...

400-8280580 18061582653

Thermal Snow Melting Cable by SIM

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Jiangsu/Wuxi
有效期至:
长期有效
最后更新:
2024-10-17 10:36
Product Details

SIM:

Insulating Resistance:

> 50 MΩ/km

Dielectric constant:

2KV/min

Thermal cables for de-icing are commonly used in constant power series configurations, applied for snow and ice melting on gutters, drainage channels, roofs, ramps, stairs, sidewalks, parking lots, and more. They can also serve as heating solutions for homes, cinemas, sports stadiums, and yoga studios.

Our SIM snow melting heating cables are enhanced with an additional layer of stainless steel braiding on the original cable sheath, boosting their mechanical strength for use in roads and bridges. They utilize innovative alloy materials as heating elements and are widely applied for frost prevention and snow removal on airport runways and bridges.


1. Melting Snow Cable Model Description

SIM/ST-□

£: 20°C, resistance per kilometer

ST: Stainless Steel Braiding

SIM: Snow Melting Cable


2. Main Technical Parameters of Snow Melting Cables

Model20°C, Resistance Ω/Km per kilometerInsulating ResistanceDielectric constant
SIM/ST-03030>50MΩ/km2KV/min
SIM/ST-04545
SIM/ST-07575
SIM/ST-0100100


3. Application Sites: Airport runways and road gradients. Caution should be taken in actual application as follows:

1) The top and bottom layers of the cable laying should be paved with pure cement; stones should not be mixed to prevent damage to the cable.

2) The thickness of the cement layers should vary accordingly based on the size of the road load.

Avoid direct connection of de-icing cables to the power source; instead, use a cold-end connection wire.

4) Cables should be pre-fabricated in the factory based on the on-site conditions or engineering drawings.

5) If equipped with a de-icing sensor, the cable heating can be automatically initiated and stopped.

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
400-8280580

Back to Top