Installation comes with clear core precautions, and the process is not overly complex. Before installation, a survey of the factory's load-bearing capacity and space dimensions must be conducted to determine the track layout and support points, ensuring the factory's steel structure can meet its load requirements. During installation, no complex welding is needed; simply assemble the tracks according to modular design, secure the hanging devices and trolley, but be mindful that the track connection points must be firmly bolted with high-strength bolts. After installation, the system must be debugged and tested for lifting, movement, and safety features. Only after confirming the positioning accuracy and smooth operation can the installation be put into use.