详情描述

Ningbo Bofang Wind Power Technology Co., Ltd. was established on February 15, 2016. The legal representative is Wang Shulan.
The grouting material for wind power connects with the capillary vessels of the original concrete, allowing the concrete colloidal solution to interpenetrate, creating a self-healing effect for the surface. It exhibits stronger compatibility, work flexibility, and interpermeability with rural substrates. The grouting material is zero-pollution, aging-resistant, and has excellent performance. During its application, it does not easily emit harmful substances that pollute the environment, and it does not become brittle or weather easily without grouting, offering good performance. The grouting process is simple and straightforward. After the grouting of the equipment foundation is completed, it is advisable to cut a 45° angle along the edge of the bottom plate after the grouting material has started to set. If edge trimming is not possible, the surface of the grouting layer should be smoothed with a bread knife after it has started to set. For the renovation and reinforcement grouting of reinforced concrete, the surface of the concrete for the epoxy grouting material should be fully prepared.
南宁风电灌浆料sikagrout 3200
Wind turbine grouting material, in this type of chemical substance, is still suitable for use in surface grouting repair methods to improve the corrosion resistance of reinforced steel in grouted structures. First, the surface is thoroughly cleaned, then washed clean with working pressure water, followed by injecting 1 part grouting material with 2 parts concrete slurry, and finally, maintenance. In cases of severe honeycomb-like deficiencies, the deficient grouting material layer should be chiseled out, thoroughly cleaned, compacted, and then filled. The treatment for hole deficiencies primarily involves immediately starting the grouting process for the joint on the original grouting material surface. Conduct three days of wet maintenance on the grouting material surface, followed by filling with fine stone grouting material.
南宁风电灌浆料sikagrout 3200
The weighing accuracy of the grouting material for wind power applications should be within 1% when mixing the slurry, with concrete, pressure grouting agent, and water weighing accordingly (all based on the quality of the slurry material). All weighing measurements must comply with legally regulated metrological standards and be used within the validity period. Prior to blending and processing the grouting material, it is necessary to clean the construction machinery and equipment. After cleaning, the machinery should not contain sediment or standing water. When the pressure grouting material is transferred from the mixer to the storage tank, the gap should not exceed 22.
南宁风电灌浆料sikagrout 3200
Wind turbine grouting material, commonly packed and stored using the method of common foot screws: the grouting material is packaged in 50kg bags, stored in a naturally ventilated and dry place, and protected from direct sunlight. For longer machinery or track grouting, it is recommended to use segmented construction. During the grouting process, if water leakage is observed on the surface, a small amount of CGM dry wind power granular material can be sprinkled to absorb the moisture. The parts to be removed should be addressed before the grout layer has fully set. Throughout the grouting construction process until demolding, it is necessary to prevent vibration and impact to the grout layer to avoid damaging the unset grout. Application range: cement self-leveling, shrinkage-free, micro-grouting material expansion, high strength, and early-strength grouting material. In summer, high temperatures and dry conditions on the construction site often lead to many unnecessary difficulties, such as rapid evaporation of moisture, resulting in insufficient grout fluidity, inadequate compaction, insufficient compressive strength, or various construction difficulties due to inadequate maintenance, causing significant harm to construction. How to address the challenges of summer grouting material construction? During summer construction, grouting often occurs on-site during the grouting process, and not after the wind turbine grouting is completed, which may pose the risk of "eating construction joints." High summer temperatures and rapid moisture evaporation can easily lead to a concrete water-cement ratio imbalance. Therefore, it is recommended to grout and mix as much material as needed, and immediately proceed with the grouting work after mixing. This ensures both construction quality and prevents damage due to insufficient fluidity.
Customers are the lifeblood of our company, and our eternal pursuit is to meet their needs to the fullest. It is due to the superior quality of our products, coupled with our passionate and attentive pre-sales and customer service, that our products have earned deep trust in the mineral processing and construction reinforcement industry.

询价单

主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》