Test Transformer_SupplyPro Co., Ltd._Suzhou Haitian Power Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Suzhou Haitian Power Technology Co., Ltd.

High-voltage Power Test Equipment

18112125050

Test Transformer

产品Price 8000.00/Set

最小起订Quantity:1 Set 供货总Quantity: 30 Set

用手机扫描二维码直达商品手机版
MobileView details
Location:
Jiangsu/Suzhou
有效期至:
长期有效
最后更新:
2022-11-18 09:15
Product Details

Transformer Precautions

1、 Please connect the working circuit according to the tests you have conducted. The transformer's housing and the housing of the operating system must be reliably grounded. The high-voltage winding of the test transformer must be...XEnd(High-pressure Tail)and measure the windingFThe terminal must be reliably grounded.

2、 During cascade testing, the low-voltage windings of the secondary and tertiary transformers.XEnd, measure the windingFEnd and high-voltage windingXEnd(High-pressure tail)All shells of the transformers at this level are connected. The shells of the secondary and tertiary test transformers must be grounded through insulating brackets.

3、 Before connecting the power supply, the voltage regulator of the operating system must be adjusted to zero before the power can be connected, the switch closed, and the voltage increase commenced.

4、 Start from zero and rotate the pressure regulator's handwheel uniformly to increase pressure. Methods for increasing pressure include: the rapid pressure increase method, which is20sStep-up method; Slow-rising voltage method60sStep-up method; optional ultra-slow step-up method. Voltage starts from zero and rises at a specified rate and speed to the desired rated test voltage.75%Afterward, at a rate of2%Increase the rated test voltage to the required rated voltage, and closely monitor the readings on the measuring instruments as well as the condition of the item under test. If any abnormal indications on the measuring instruments or condition of the item under test are observed during the voltage increase or testing process, immediately reduce the voltage, disconnect the power supply, and investigate the situation.

5、 After the test, the regulator should be returned to zero position at a uniform speed within a few seconds, then the power should be cut off.

6、 This product must not exceed the rated parameters. Full voltage power on or off is strictly prohibited, except for necessary testing.

7、 When using this product for high-voltage testing, in addition to being familiar with this manual, it is essential to strictly adhere to national standards and operational procedures. Refer toGB311-83"Insulation Coordination for High-Voltage Transmission Equipment, High-Voltage Testing Technology"; "Preventive Testing Regulations for Electrical Equipment" etc.

TransformerAccessories

1、 Operating System:

Operation Box      Capacity:1kVA~5kVA      Input Voltage:0.22kV

Operator's console      Capacity:10kVA~300kVA   Input Voltage:0.22kV  0.38kV  

2Protective Digital Microampere MeterQSA

3DC/AC resistor/capacitor voltage dividerFRC50100150200kV 

4High-voltage DC Discharge RodFZ70140210kV

5High-voltage Silicon Stack2DL150300450kV

6Insulating Bracket50100200300kV

7High-voltage filter capacitor0.01μF~0.1μF40~100kV

8、 Equalizing ball

9Protecting Ball GapQ50100150200250500

10Standard Oil Sample Cup400ml

11Medium oil cup

12Collapsible Folding Cart150300Type

13Water Resistor

14High-voltage tester1035kV

15High-voltage Phase Stabilizer1035110220kV

16Universal Meters, Megohmmeters, and Test Leads


Operation Instructions for Control Box:

1. Connect the operation box, transformer, and test item according to the test requirements.

2. Set the overcurrent relay current value and the timer relay time value according to the normal test current required for the sample and the voltage endurance time.

3. Plug in the power source, the green light illuminates, and turn the voltage regulator handle to the zero position.

4. Press the start button, one main circuit closes, and the voltage regulator is powered. Rotate the voltage regulator handle clockwise to increase the voltage. Pay close attention to the voltage gauge, and when it reaches the specified withstand voltage of the test item, press the timer button and monitor the condition of the test item.

5. When the pressure timing is up, the operation box automatically emits an alarm. At this point, immediately rotate the regulator handle counterclockwise to zero, press the stop button and the timing button. The red light goes out, and the green light comes on. The test is then complete.

6. In the process of boosting or pressure resistance, if overcurrent occurs due to short circuits, flashovers, or breakdowns, the overcurrent relay will trip and cut off the main circuit. At this point, the voltage regulator should be rotated counterclockwise to the zero position.

Technical Conditions for Control Box:

1. Capacity:1.5 KVA——500KVA

2. Operating Voltage: AC220V(380V)

3. Warm    Degree:0℃40℃

4. Altitude:<1000m

5. Relative Humidity:<90%

6. The workplace should be free of gases, vapors, chemical dusts, and other explosive and erosive media that could severely affect insulation.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
18112125050

Back to Top