Rotary Kiln Support Wheel Manufacturer_SupplyPro Co., Ltd._Xuzhou Jiankui Building Materials & Machinery Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Xuzhou Jiankui Building Materials & Machinery Co., Ltd.

Ball mill large gears, rotary kiln large gears, drying machine belt

Consultation Hotline
13775840308

News Center Co., Ltd.

Product Categories

Contact Information
  • Contact person:颜大海
  • Telephone:13775840308
  • 邮件:2272092540@qq.com
  • Mobile:13775840308
  • 传真:13775840308

Home > SupplyPro Co., Ltd. > Rotary Kiln Support Wheel Manufacturer
Rotary Kiln Support Wheel Manufacturer
品牌: Established Kei Kuai
Standard Type: Is
Is in stock: Sure
Are you looking for wholesale?: Is
单价: 68999.00/Payment
最小起订Quantity: 1 Payment
供货总Quantity: 10000 Payment
有效期至: 长期有效
最后更新: 2024-10-28 15:24
 
详细Info

Rotary Kiln Large Gear Ring Installation and Alignment: Key Points to Note: (1) Before installing and aligning the large gear ring of the rotary kiln, the cylinder centerline at the riveted spring plate must be adjusted to the correct position. (2) During the installation and alignment of the large gear ring, the pre-installation is a critical step. It must be of high quality, standards, and strict requirements. The alignment during the installation process is merely "centering" and cannot correct the gear ring. The pre-installed large gear ring must be lifted and installed as a whole; otherwise, it will be difficult to install and tighten the pin and bolt at the gear ring mating point, and it cannot ensure the gear pitch error and gear ring roundness tolerance. (4) The spring plate and cylinder must fit tightly in a free state without forcing them to be fixed or riveted together. Otherwise, after releasing the helical cap and wire, the radial and end face跳动 of the large gear ring of the rotary kiln will increase or exceed the tolerance under the action of the spring plate. (5) The radial and end face跳动 values during precise alignment must be less than the standard values. After removing the helical cap and wire, the radial and end face跳动 of the large gear ring of the rotary kiln may increase, but the difference will not exceed the tolerance. (6) When drilling holes for the spring plate and cylinder, follow the sequence in the drawing, and tighten one locating bolt for each hole. (7) After the large repair of the rotary kiln is delivered for production operation for 12-24 hours, stop the kiln to check the rivet condition of the spring plate and re-tighten the bolts for the large gear ring mating.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

13775840308