License Projects: Construction Engineering & Construction (Operational projects require approval before conducting business activities; the specific business scope is subject to the approval results). General Projects: Flooring Sales; Building Materials Sales; Mechanical & Electrical Equipment Sales; Architectural Decoration Materials Sales; Hardware Products Wholesale (Except for operational projects, conduct business activities independently and lawfully based on the business license).


价 格Negotiable
最小起订0 piece库存0 piece
Business Card
Vintage flooring
Negotiable
Concrete sealant curing agent flo
Negotiable
Epoxy Self-Leveling Colored Sand
Negotiable
Water-based epoxy flooring
Negotiable
Epoxy Anti-corrosion Flooring
Negotiable
Epoxy Self-Leveling Floorings
Negotiable
Rubber Track
Negotiable
Water-based polyurethane mortar f
Negotiable
Epoxy Smooth Floor Coating
Negotiable
Solvent-free epoxy flooring
Negotiable
Application Range
1. Highly specialized, dust-free and sterile environments such as aerospace and aviation.
2. GMP facilities, aseptic cleanrooms for blood products, precision machinery, microelectronics manufacturing plants, and areas with high mechanical and chemical performance requirements.
Performance Features
1. Smooth, aesthetically pleasing surface with mirror-like finish.
2. Solvent-free, odorless, non-polluting, and non-toxic.
3. Features acid, alkali, and chemical resistance.
4. Excellent resistance to moisture, salt mist, oils, and organic solvents.
5. Wear-resistant, pressure-resistant, shock-resistant, high-temperature-resistant, waterproof, with some elasticity.
6. One-time molding of the surface layer, quick and convenient.
Construction Technique
1. Dust-free polishing machine floor sanding and cleaning, removing oil stains and debris.
2. Apply one coat of epoxy primer, ensuring ample coverage; excessive sanding of the surface may increase paint consumption.
3. After full curing, apply solvent-free intermediate mortar layer by scraping, and brush according to the ground condition.
4. After the mortar layer cures, fine sanding is performed, followed by the application of an epoxy putty.
5. Trowel and spread self-leveling flat paint for even coating.
6. After completion of construction, it is safe for occupancy within 24 hours and can bear load after 72 hours.
Process Diagram


Phone Consultation