License Projects: Construction Engineering & Construction (Operational projects require approval before conducting business activities; the specific business scope is subject to the approval results). General Projects: Flooring Sales; Building Materials Sales; Mechanical & Electrical Equipment Sales; Architectural Decoration Materials Sales; Hardware Products Wholesale (Except for operational projects, conduct business activities independently and lawfully based on the business license).


价 格Negotiable
最小起订0 Piece库存0 Piece
Business Card
Epoxy Sand-Grit Anti-Slip Floorin
Negotiable
Vintage flooring
Negotiable
Water-based epoxy flooring
Negotiable
Anti-vibration non-slip flooring
Negotiable
Full Steel Anti-Static Ventilated
Negotiable
Silicone Self-Leveling Floorings
Negotiable
Concrete sealant curing agent flo
Negotiable
Vinyl Ester Corrosion-Resistant F
Negotiable
Water-based polyurethane matte fl
Negotiable
Epoxy Anti-corrosion Flooring
Negotiable
Application Scope
Suited for cafes, restaurants, Western dining, tea houses, internet cafes, offices, clothing stores.KTV, museums, libraries, retail stores, and other modern retro flooring renovations are widely used by interior design companies for villa and home retro renovations.
Performance Features
1. Resistant to strong acids and alkalis, abrasion, pressure, impact, moldproof, waterproof, dustproof, and non-slip.
2. Dust-free materials
3. One-time coating process, no joints.
4. Strong adhesion, wear resistance, and high hardness.
Construction Process
1. Surface Preparation: The concrete surface must be completely dry, free of oil stains, and not to be cleaned with water. Depending on the condition of the surface, proper sanding, repair, and dust removal should be carried out.
2. Mix the antique floor paint A and B components in a 2:1 weight ratio and ensure even mixing. Use an electronic scale for batching, but avoid overfilling. The mixed material is usable for about 20 minutes at room temperature (20°C). Apply one coat using a solvent-resistant roller, and use a brush to apply in areas not reached by the roller, such as corners.
3. Can be applied 2-3 times depending on ground conditions.
4. Construction is complete 24 hours before occupancy and 72 hours before re-loading.
(At 25°C, the opening time for low temperatures should be appropriately extended.
Process Diagrams


Phone Consultation