The high current generator is an essential equipment for power and electrical industries that require high current during debugging. It is used in power plants, substation transformer stations, electrical manufacturing plants, and research institutions, among others. It operates on a short-term or intermittent basis and features compact size, light weight, and ease of use and maintenance. We can customize high current generators for our customers' temperature rise and heat generation tests, including switch circuit breakers, busbars, connectors, and contacts. Additionally, we offer customized three-phase current boosters with fine-tuning and balancing functions.
Key Technical Parameters
The equipment's capacity is designed to be5Minute Short-Term Work System Design: If used for intermittent work systems, the total duration should2.5Minute on, off10Minute cooldown, this intermittent test can be cycled in this pattern.
Volume:5KVA
Power Voltage:AC220V/50HZ
Output Voltage:5V(Parallel)/10V(Continuation)
Output Current:1000A(Connected)/500A(Connect)

Equipment Operation Instructions
1Plug in the power input aviation plug line, the external power supply can be connected to the air switch, with an electric current of no less than20ANo Chinese content provided.AC220V。
2.Observe whether the regulator is0Calibrate, if not automatically. Then, select the series or parallel wiring method as required, connect the output current wires, and toggle the button switch next to the ammeter. If the high output is1000APlease provide the Chinese content to be translated.1000APlease provide the Chinese content that you would like translated into American English.500ANo Chinese content provided.500ADocument.
3.Turn off the power switch, press the red output button, and adjust the voltage control knob to reach the desired output current value. At this point, the increased current can be observed through the high current output gauge.
4.After the device reaches the current value, maintain5Please reset the timer to zero, then press the output button again. The regulator will be disconnected and stop working. Wait for the regulator to cool down.10In minutes, back to work.
5Upon completion of the test, please disconnect the external power source first, then remove the instrument test cables, and ensure the instrument is clean.