The project is located on Dalang South Road, Longhua District, Shenzhen, on the third floor of the Shenghui City Sales Center. This project was awarded to Minghui Industrial Technology Co., Ltd. in September 2021, and was completed in 1 month of construction.
The total length of the acrylic pool panels is 20 meters, composed of three panels, each around 7 meters in length. Two of the panels were assembled at the factory, while the remaining one was assembled on-site. The image below shows our team member applying epoxy resin coating at the completion of the civil engineering phase of the project.

The following image shows the acrylic panels being securely fastened during on-site assembly.

Due to the project being adjacent to the road after completion, a complete exterior photo was not taken.