High-pricedRemoveRecycled waste or obsolete chemical factory equipmentEquipmentAnd various types of reactors,Outer tube half-tube design, electrically heated stainless steel, steam-heated thermal oil circulating heating, multi-functional dispersing, electrically heated type,Spiral jacketed, external half-tube, internal coiled, drying finned tubeYZG Vacuum Dryer, Bi-conical Rotating Vacuum Dryer, Radiator, Hot Air Circulation Oven, Rotating Flash Dryer, Enamel Reactor Vessel, Stainless Steel Reactor Vessel, Glass Reactor Vessel, Enamel-lined Reactor VesselWait a minute.
Persons entering the construction site must wear hard hats. Any work performed at heights,Mandatory seatbelt use. Implement substantial, effective, and safety-assuring protective measures. Promptly clean and segregate materials during disassembly, and stack them in designated areas. Keep construction site materials neatly arranged, maintain clear pathways and drainage pipes, ensure no standing water, and promptly remove construction waste.。Assign a person to water the area regularly to maintain humidity.
The pressure of the blowing air source for process pipelines is generally controlled at:0.6~0.8 MPa. Adjust the pressure of the blowdown gas source as needed. Remove the instruments on the blowdown pipe to prevent damage to the instrument components. Additionally, take appropriate protective measures for the regulating valve; if necessary, remove it and install a temporary reducer. Prior to blowing, blind plates must be added to the inlets and outlets of heat exchangers, towers, and other equipment. Blowing can only proceed after the upstream blowdown is approved.