Prior to the demolition construction of a chemical plant, both parties must conduct a safety technical briefing for the relevant operation management personnel based on the characteristics of the construction content. It is mandatory to inspect and confirm the safety reliability of the equipment and tools, as well as protective gear (insulated shoes, insulated gloves, anti-toxic masks, safety helmets, safety belts, safety ropes, etc.) used in the construction work. All operations during the equipment demolition must strictly comply with the operation permit system and corresponding safety technical specifications.
Our company boasts over 20 world-class mechanical equipment such as extended arm hydraulic shears, hydraulic hammers, and wall saws, along with a fixed team of over 200 specialized construction personnel. We have accumulated extensive construction experience in the dismantling process, ensuring the intact protection of communication lines, power lines, and underground pipelines. The company has a wealth of factory dismantling experience and top-notch dismantling equipment. We are capable of undertaking dismantling projects for various large-span structures.
Our company, based in Suzhou, with the Yangtze River Delta as our gateway, and supported by Shandong, Hebei, Anhui, and Hubei provinces, is composed of experienced engineers, technicians, and construction workers, equipped with advanced equipment and technology. We can achieve fast progress, low costs, minimal environmental disruption, and safety reliability. We strictly adhere to the construction process to ensure the safe, efficient, and high-quality completion of demolition tasks.
Demolition of buildings containing hazardous chemicals for production, use, or storage requires review by fire and safety departments, establishment of safety plans, and implementation upon approval. Set up temporary protective facilities to prevent sand, stone, and dust from affecting normal production during demolition. Establish a caution zone sign in the hazardous area. Ensure temporary power and water supplies for construction, and do not use the electrical facilities within the building being demolished for site lighting; an alternative installation should be provided.






























