Our company boasts extensive experience in factory demolition construction contracts and a complete range of machinery and equipment. We can undertake the demolition of factory buildings of various structures with large spans, as well as the disposal of obsolete assets, factory sales, various stockpiles, and淘汰物资. We specialize in demolition and relocation projects, serving hotels, guesthouses, factories, corporate entities, factory and site relocations, hotel demolitions, supermarkets, department stores, guesthouses, tea restaurants, dining venues, schools, bathhouses, and office building demolitions, among others. Equipped with advanced equipment and rich experience in demolition construction.
Specialized in hotel demolition, factory relocation, industrial equipment removal, and contracted demolition projects, including the dismantling and recycling of mobile offices, power rooms, electrical cables, industrial machinery, refrigeration equipment, air conditioning systems, production lines, etc. Large-scale indoor demolition and decoration, including ceiling, ventilation systems, partitions, and wall breaking. Outdoor structural billboards, neon signs, and decorative renovations. Building demolition, specializing in all types of complex structures and high-difficulty buildings. Dismantling and recycling of various chimneys, water towers, iron chimneys, iron towers, rooftop towers, monopole towers, and television towers.
Upon accepting the project, we thoroughly understand the owner's requirements for the removal of underground pipelines and adjacent structures, and hold a technical and quality briefing meeting involving personnel from design, construction, supervision, and construction units before the project starts. Before the construction, we prepare the implementable construction organization design, construction plans, technical measures, quality assurance system for construction quality, quality plan, quality control procedures, and quality assurance measures in accordance with the construction technical specifications.
During blowdown, the safety valve should be disconnected from the pipeline and a blind plate should be added to prevent damage to the safety valve. System blowdown air source: System blowdown requires a large amount of compressed air (nitrogen), with fast flow rates through the pipeline and system, thus sufficient pressure and airflow must be ensured to guarantee the blowdown quality. Preparation conditions for 3 air (nitrogen) blowdown: completion of process system pipeline and equipment installation, and passing the strength test pressure.