Prior to the dismantling construction of a chemical plant, it is essential that both parties conduct a safety technical briefing for the relevant operation managers based on the characteristics of the construction content. The safety reliability of the equipment and tools, protective gear (insulating shoes, insulating gloves, respiratory protection masks, safety helmets, safety belts, safety ropes, etc.) used in the construction operations must be inspected and confirmed. All operations during the dismantling of the facility must strictly adhere to the operation permit system and the corresponding safety technical specifications.
Our company owns over 20 world-class heavy machinery including extended-arm hydraulic shears, hydraulic hammers, and wall saws, and has more than 200 specialized construction personnel. We have accumulated extensive construction experience during the dismantling process, ensuring the complete protection of communication, power lines, and underground pipelines. The company boasts a wealth of factory dismantling experience and state-of-the-art dismantling equipment. We are capable of undertaking factory dismantling projects of various structures with large spans.
Our company, based in Suzhou with the Yangtze River Delta as our gateway, and relying on Shandong, Hebei, Anhui, and Hubei, is composed of experienced engineers, technicians, and construction workers, equipped with advanced equipment and technology. We can achieve fast completion, low costs, minimal environmental disruption, and safety and reliability. We strictly adhere to the construction process to ensure the safe, efficient, and high-quality completion of demolition tasks.
Demolition of buildings containing chemical hazardous materials requires participation of fire and safety departments for review, formulation of safety plans, and implementation upon approval. Temporary protective structures must be set up to prevent sand, stone, and dust from affecting normal production during demolition. Warning signs should be posted in the hazardous area. Ensure temporary power and water supplies for construction, and avoid using the electrical installations from the building being demolished for site lighting; additional wiring should be installed.