At the end of each day's demolition work, all machinery and equipment should be parked away from the demolished building. Temporary facilities during construction should maintain a certain safe distance from the demolished structure. Temporary electrical power at the construction site must be implemented in accordance with the relevant provisions of the current national standard "Technical Code for Temporary Electrical Safety at Construction Sites." All electrical equipment must have a good grounding device. Electric machinery must be managed by designated personnel.
Air (Nitrogen) Blowing, air blowing is a method that uses air as the medium, compressed by an air compressor to 0.6~0.8Mpa, and then blows away residual debris in process pipelines. 1 Principles and Requirements for Air (Nitrogen) Blowing: When selecting air (nitrogen) blowing for process pipelines, ensure sufficient air volume to make the blowing gas flow velocity greater than the normal operating velocity, or at least not less than 20m/s.
Flushing of the recirculating water system. The water flushing of pipelines should be conducted at the maximum possible flow rate within the pipeline or not less than 1.5 m/s, with flow direction from high to low. The water quality for flushing must meet the requirements of the pipeline and equipment materials. Generally, for equipment and pipeline flushing, a turbidity of less than 10 mg/L and a chloride ion content of less than 100 ppm are used. Flushing should be carried out in a sequential, segmented, and continuous manner. The cross-sectional area of the discharge outlet should not be less than 60% of the cross-sectional area of the pipeline being flushed. Ensure the discharge pipeline is clear and safe. Only after the upstream flushing outlet has passed the qualification can the subsequent system flushing proceed.
Our company is committed to actively, proactively, and efficiently serving our clients. Guided by the principle of "putting the clients' needs first and thinking like the clients," we strive to expand and enhance the scope and depth of services for clients, contractors, and designers alike. We closely collaborate with the principal party and sincerely accept engineering projects. Our management team boasts high-quality comprehensive qualifications, strong business capabilities, solid work style, practical experience, and technical management skills in critical engineering technologies, making it one of our outstanding project management teams.