Chemical factories' outdated chemical equipment removal and recycling services are available on-site. We dismantle and recycle equipment that is aging, has outdated technical performance, high energy consumption, low efficiency, and poor economic benefits. For equipment that is severely damaged beyond repair due to wear, corrosion, accidents, or other disasters, or that severely pollutes the environment and endangers personal safety and health, or that is explicitly required to be phased out by national regulations, we provide recycling and dismantling services.
First-tier industrial factory demolition qualification, first-tier demolition project for chemical factories. Our company specializes in the dismantling of chemical factories, oil refineries, starch factories, distilleries, milk factories, monosodium glutamate factories, beverage factories, chicken essence factories, breweries, fertilizer factories, and wastewater treatment plants, etc. We offer dismantling projects for various factory buildings and the purchase of scrap equipment from bankrupt enterprises. With years of experience in the demolition industry, we have extensive dismantling expertise. Please call for more information!
Each critical step in the decommissioning process is confirmed by a designated person. Internal equipment such as process pipelines, towers, and containers are blow-scanned, cleaned, and replaced to remove all hazardous media. Any toxic or flammable substances remaining in equipment like tanks and kettles must be confirmed on-site. Specialized operators must be certified, and supervisors must be trained and certified.
During construction, a designated person must monitor the structural condition of the buildings being demolished. If there is a tendency towards instability, operations must be halted immediately, and effective measures must be taken to eliminate the hazard. All dismantled materials must be cleared promptly, categorized, and stacked in designated areas, without throwing them from heights. The removed materials and construction waste should also be cleared away promptly, and high-altitude throwing is strictly prohibited.
Prior to dismantling the factory, we first develop a management plan for the health and safety of the surrounding environment. We pre-seal the factory's outgoing pipeline network to prevent chemical contamination of the external environment. To ensure the land can be reused, we strictly adhere to standards and ensure no pollution is caused to the land and surrounding environment during the dismantling process. We have a comprehensive environmental safety management system that covers everything from training to operational management.