Before construction personnel enter the job site, a joint special safety education and technical briefing is conducted by the construction unit and the factory. This ensures an understanding of harmful factors and preventive measures in the construction process. Clearly brief the on-site dismantling items, assign a liaison person for the briefing, provide drawings that match the on-site condition, and detail the intermediate media for all equipment and pipelines. Conduct an on-site briefing. Assign responsibilities for blowing, cleaning, inspecting, and confirming, and implement corresponding fire safety measures. Prior to dismantling, a process treatment must be carried out to ensure no residual media remains.
Our company undertakes contracts for power plants, chemical factories, cement plants, engine sets, boilers, cooling towers, chimneys, concrete bridges, as well as equipment and building demolition and recycling. We specialize in construction engineering, petrochemical engineering, environmental protection engineering, power engineering, and general contracting for municipal public works. We also offer specialized general contracting for steel structure projects. We provide services for the demolition and recycling of buildings, bridges, factories, steel structures, frames, and large equipment. Our services include construction demolition and cleaning, land leveling for construction projects, building demolition projects, and the demolition, modification, and reinforcement of structures. We also offer indoor and outdoor equipment and decoration demolition, as well as crushing and modification projects.
Establish detailed daily plans. Should any delays be observed in the daily plans compared to the overall progress schedule, adjustments must be made promptly, and corresponding corrective measures implemented to devise feasible plans, ensuring the accomplishment of the overall progress schedule. To ensure the realization of plan objectives, all departments must work closely in coordination, with a unified approach. This includes the supply of materials and equipment, allocation of labor, and collaboration with specialized teams.
Chemical plants, various types of factories, sales offices, steel structures, hotels, shopping malls, KTVs, bathhouses, office buildings, chimneys, gas stations, factory buildings, etc., for large, medium, and small indoor and outdoor demolition projects. We recycle various waste materials and equipment. Having successfully completed demolition work for several large-scale projects, we have received unanimous praise in the industry and established stable cooperative relationships. Our advantages include low quotes and rapid construction.
During blowing, the safety valve should be disconnected from the pipeline and a blind plate should be added to prevent damage to the safety valve. System blowing air source: System blowing requires a large amount of compressed air (nitrogen), which flows quickly through the pipeline and system. Therefore, sufficient pressure and airflow must be ensured to guarantee the blowing quality. Preparation conditions for 3 air (nitrogen) blowing: Process system pipeline and equipment installation completed, and passed the strength test pressure.