TianShun Demolition Engineering Co., Ltd. in Zhumadian CityVIP

混凝土切割,支承梁切割,广告牌拆除,水塔拆除工程
Enter Shop

Concrete cutting, phone line removal, mall renovation; undertaking all sizes of demolition projects

平台认证
  • Unit Price

    $100.00/square meters

  • Brand

    Tian Shun Demolition Project

  • MOQ

    1square meters

Contact
Leave Msg

Platform Service

Supplier Verified



驻马店市天顺拆除工程有限公司

VIP   数字营销第1年
资料通过中商114认证
Category
  • No Category
Recommend

Product Details

Specs

Gallery

  • Brand:

    Tian Shun Demolition Project

  • Unit Price:

    $100.00 / square meters

  • MOQ:

    MOQ1square meters

  • Total:

    9999square meters

  • Address:

    HenanZhumadian

  • Delivery:

    3days

  • View More

Description

During the house demolition process, attention must be paid to prevent accidents; after the demolition is completed, the site must be cleaned and disposed of to ensure no impact on the surrounding environment and residents.
Concrete Slab Cutting Methods:
Cut according to the principle of no more than 500 kg per small piece, and then unload the concrete blocks onto the floor below or the ground.
2. Based on the design drawings, determine the cutting area. First, mark the required cutting edges on the floor surface with ink lines, then determine the size of the floor sections according to the lifting equipment, which is approximately 1.5m x 1.5m.
3. Clear the cutting area, including the removal of ground structures and decorative debris, as well as affected pipelines (air ducts, electrical conduits, rainwater pipes, etc.).
4. The floor slabs are cut around the edges using a flat-push electric cutting machine, and the central sections are cut into pieces by securing the track of a small cutting machine to the slab surface with expansion bolts.
5. Before cutting the floor slabs of the main structure, a steel truss crane is assembled for hoisting, which is then secured to the beams.
Drill four evenly spaced holes on the floor tile section to be cut, thread the wire rope through, then hang it on the hooks of two hand winches, and suspend the concrete cutting winch on the hoist frame.
Tighten the hand winch to ensure full tension.
7. Utilizing reinforced concrete cutting machines, with personnel on-site for construction.
8. After cutting, use two manual winches to gently lift the cut floor panels and place them carefully onto the lower floor or ground level.
驿城区拆除商场改造
Our company specializes in the cutting and demolition of buildings, bridges, highways, etc., primarily engaged in structural demolition of buildings, bridge cutting, support beam cutting, underwater cutting, tunnel cutting, and highway guardrail cutting and demolition. Our business scope covers civil construction, industrial buildings, municipal roads and bridges, water conservancy projects, power engineering, and railway engineering.
驿城区拆除商场改造
Static Cutting Demolition: During construction demolition, the static demolition method is used, which prohibits the use of equipment with high vibration such as crushers or jackhammers to avoid secondary damage to the structure. Instead, static demolition tools like water drills, wire saws, hydraulic clamps, expanding charges, and splitters are employed. Generally, the cost of water drills is lower, while wire saws are more expensive.
驿城区拆除商场改造
Concrete Cutting Services: Hydraulic wire saw cutting, wall saw cutting, hydraulic disk saw cutting, water jet cutting, chain saw cutting, reinforced concrete cutting, concrete wall cutting, floor slab cutting, concrete cutting, reinforced concrete cutting, static cutting, bridge cutting, beam support cutting, pier cutting, equipment foundation cutting, construction cutting, building cutting, wall cutting, floor slab cutting, ground cutting, pavement cutting, box girder cutting, column cutting, large beam cutting, shear wall cutting, load-bearing wall cutting, collision wall cutting, collision barrier cutting, wall cutting for door openings, floor slab cutting for door openings, non-destructive static cutting, etc.
Important considerations for house demolition construction include:
Construction workers for dismantling operations have been trained by the administrative department's training institution and are authorized to proceed with construction upon relevant permits.
Upon entering the construction site, the first safety consideration for dismantling operations is to ensure proper protection. Operations should be conducted on the erected scaffolding, and appropriate protective gear such as helmets, gloves, shoes, etc., should be worn. When working at heights, secure the safety belt, and ensure it is properly fastened and the anchoring point is secure.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $100.00 / square meters
Sales None
Delivery HenanZhumadian3dayswithin
Stock 9999square metersMOQ1square meters
Brand Tian Shun Demolition Project
Application Scope Hotel Demolition, Building Demolition
Engineering Type Building Demolition
Demolition Scope Complete disassembly
Expiry Long Valid
Update 2025-04-02 09:37
Gallery

TianShun Demolition Engineering Co., Ltd. in Zhumadian CityPublished byConcrete cutting, phone line removal, mall renovation; undertaking all sizes of demolition projectsGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top