Shandong Xinheng Heavy Industry Technology Co., Ltd.VIP

单梁龙门吊、双梁门式起重机、天车、天吊起重机、悬挂起重机、双梁起重机、航吊起重机、单梁行车
Enter Shop

Double girder crane

平台认证
  • Unit Price

    Negotiable

  • Brand

    ShinHeng Technology

  • MOQ

    1Tai

Contact
Leave Msg

Platform Service

Supplier Verified



山东鑫恒重工科技有限公司

VIP   数字营销第2年
资料通过中商114认证
Recommend

Product Details

Specs

Gallery

  • Brand:

    ShinHeng Technology

  • Unit Price:

    Negotiable

  • MOQ:

    MOQ1Tai

  • Total:

    9999Tai

  • Address:

    ShandongTai'an

  • Delivery:

    0Hours

  • View More

Description

Double girder cranes are widely used, with their operation primarily consisting of three movements: the trolley moving vertically, horizontally, and the lifting hook moving left and right.


The hoisting transmission system of the double girder crane: The power unit of the lifting mechanism is transmitted from the motor, which is then conveyed to the high-speed shaft end of the reducer through a gear coupling, a compensating shaft, and a brake wheel coupling. After the motor rotates at high speed and is reduced to the required speed ratio by the reducer, the slow-speed shaft of the reducer inputs and outputs driving force, which is then transmitted to the drum group through the inner gear ring inside the drum. Finally, it is adjusted by galvanized steel wire rope and pulleys as the lifting hook to achieve the effect of adjusting the load.

Double girder crane trolley running system transmission: Drive force is transmitted from the motor through a brake wheel coupling, a compensating shaft, and a half tooth coupling to the high-speed shaft end of the vertical reducer. After the motor rotates at high speed and is reduced to the required speed ratio by the vertical reducer, it is output from the slow-speed shaft of the reducer. The slow-speed shaft is connected to the car's rotating shaft via a half-tooth coupling, a compensating shaft, and another half-tooth coupling, thereby rotating the trolley's rotating shaft and achieving the effect of lateral transport and lifting of the load.

The drive system of the double girder crane's trolley running system: The driving force is transmitted from the motor through a brake wheel coupling, a compensating shaft, and a half tooth coupling to the high-speed shaft end of the reducer. After the motor's speed is reduced to the required rate through the reducer, it is output from the slow-speed shaft of the reducer. The low-speed shaft connects to the trolley's rotating shaft through a full-tooth coupling, thereby driving the rotation of the trolley's rotating shaft, achieving the effect of vertically lifting the load on the bridge.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery ShandongTai'an
Stock 9999TaiMOQ1Tai
Brand ShinHeng Technology
Brand Sunheng Technology
Self-weight 3 tons
Lifting Capacity 10 tons
Expiry Long Valid
Update 2024-09-04 08:36
Gallery

Shandong Xinheng Heavy Industry Technology Co., Ltd.Published byDouble girder craneGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top