Refurbished Reinforcement ProjectVIP

房屋改造加固,建筑加固,地基基础加固,碳纤维加固,包钢加固,粘钢加固,增大截面加固
Enter Shop

House structural reinforcement, Carbon fiber reinforced floor, External wall crack reinforcement

平台认证
  • Unit Price

    $488.00/Piece

  • Brand

    Good.

  • MOQ

    1Piece

Contact
Leave Msg

Platform Service

Supplier Verified



改造加固工程

VIP   数字营销第2年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    Good.

  • Unit Price:

    $488.00 / Piece

  • MOQ:

    MOQ1Piece

  • Total:

    99999Piece

  • Address:

    HunanChangsha

  • Delivery:

    0Hours

  • View More

Description

  Yiyang Residential Structure Reinforcement, Carbon Fiber Reinforcement for Floors, Wall Crack Reinforcement - Which reinforcement company in Yiyang should you choose? Go for Guode Reinforcement Company, specializing in reinforcement construction for over a decade!

As houses age, some may develop structural issues requiring reinforcement, while others may not have structural problems but their current use doesn't align with present needs. Original houses hold some value but require structural reinforcement to enhance their functionality. Structural reinforcement can meet the usage demands of houses. There are several key points to consider during this process. Below, Gude Reinforcement Company will introduce the methods used and注意事项 for house structural reinforcement construction.

Yiyang residential structural reinforcement

Foundation treatment for structure reinforcement of Yiyang buildings

1. Control settlement and differential settlement, regulate settlement rate, assess the degree and condition of foundation development, judge the settlement rate based on soil type, and determine the maximum settlement rate at the time of loading termination.

2. Consider soil factors before construction, such as weak-permeability soils like soft soil, where pore water is difficult to drain, resulting in longer stabilization times for building settlement.

Section 2: Reinforcement Anchor Bolting for Yiyang's Building Structure Strengthening

1. Inject the resin into the hole 2/3 of the way, then wrap the rust-free and cleaned end of the rebar with structural adhesive, rotating it into the bottom of the hole until the resin overflows to indicate a successful bonding.

2. During the curing period of the rebar bonding adhesive, a dedicated person must be on-site to inspect and prevent any disturbance or displacement, as well as to conduct field pull-out tests.

3. When reinforcing the cross-section, it is necessary to first chisel and grind the base surface, followed by applying an interface agent.

House structure reinforcement

Section 3: Carbon Fiber Reinforcement for Yiyang's Building Structure Stabilization

1. Prior to carbon fiber reinforcement, the concave areas on the surface must be leveled and filled, and the corner areas should be repaired to form a smooth, rounded arc.

When applying the base resin, ensure even coating and proceed with subsequent work only after it is touch-dry.

3. When applying carbon fiber cloth, it is necessary to roll and squeeze out bubbles multiple times, ensuring the cloth remains intact without damage during application. For multi-layer application, the next layer should be adhered only when the surface of each layer of carbon fiber is dry to the touch.

4. After all carbon fiber fabrics are properly bonded, apply surface protection, primarily with fire-resistant coatings, ensuring the fire resistance meets the design specifications.

Section 4: Epoxy Steel Reinforcement for Yiyang's Building Structure Strengthening

1. After the steel plate is bonded, tighten the installation bolts immediately to allow the adhesive to just squeeze out from the edge of the steel plate.

2. Structural adhesive requires 2 to 5 days to cure at around 20°C before it can be used under load. The bonding area in the anchoring zone must be no less than 90%, and the bonding area in the non-anchoring zone must be no less than 70%.

3. After the steel bonding inspection is passed, the next step is to proceed with rust removal and fire-resistant coating. Control the environmental temperature and relative humidity during coating to meet the requirements of the paint products, and clean the surface before application.

4. Rust-preventing areas must be cleaned to reveal the natural steel color. When preparing the rust-inhibiting paint, ensure even consistency in color and viscosity. Apply the primer before the base coat is dry, and continuously mix it well.

Section 5: Cracks Repair for Yiyang Building Structure Reinforcement

1. When employing continuous low-pressure injection for repairs, it is essential to control the continuous pressure increase and pressure, injecting it into the components. Commonly used on various primary structural components that require safety considerations.

2. When using the high-pressure injection repair method, the repair material is pressurized and injected into the component within a certain period. This is commonly used for continuous wall structures in underground areas, and the灌注材料 can be selected based on the actual usage conditions.

3. When using the slotting method, carve or cut V-shaped slots on the surface of the structure with a diamond cutting machine, fill with epoxy resin or elastic sealant material, and then cover the work surface with glass fiber. Commonly used for dry shrinkage cracks between brick walls or partition materials and concrete.

  

  Good Reinforcement Co., specializing in house reinforcement for over a decade! Good Reinforcement Co.With the corporate philosophy of "pursuing reputation through quality and development through reputation," and the business理念 of "honesty, trustworthiness, and continuous improvement," through arduous efforts, we have cultivated a team of well-regulated and high-standard construction professionals, equipped with a series of high-quality and high-performance equipment.

  Gode Reinforcement Company, specializing in building reinforcement for over a decade! Gode Reinforcement CompanySince our establishment, we have adhered to the corporate philosophy of "pursuing truth, being pragmatic, and collaborating sincerely." Internally, we rigorously manage our company, ensuring that departments coordinate and unify while also mutually restricting each other. We implement a system where project managers are responsible for individual engineering projects, and during construction, we aim to create model projects. On construction sites, we emphasize civilized and orderly construction practices. Externally, we expand our market with the service tenet of integrity and pragmatism, guided by sample projects and good reputation.

The above is regardingYiyang Residential Structure Reinforcement Company — Gude Reinforcement CompanyAbout Us, If you are looking forYiyang School Reinforcement Engineering CompanyPlease contact us.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $488.00 / Piece
Sales None
Delivery HunanChangsha
Stock 99999PieceMOQ1Piece
Brand Good.
Manufacturer Good
Brand Gode
Design and Construction Timeline 3-7
Expiry Long Valid
Update 2024-10-16 17:21
Gallery

Refurbished Reinforcement ProjectPublished byHouse structural reinforcement, Carbon fiber reinforced floor, External wall crack reinforcementGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top