Zhongzhou for Traffic Facilities Engineering Co., Ltd.VIP

金属材料、通用机械及配件的加工、销售;金属软管、接头的生产等等
Enter Shop

F-Type Cantilever Traffic Sign Post

平台认证
  • Unit Price

    $2.80/Rice

  • Brand

    Central for Traffic

  • MOQ

    1Rice

Contact
Leave Msg

Platform Service

Supplier Verified



周口中为交通设施工程有限公司

VIP   数字营销第2年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    Central for Traffic

  • Unit Price:

    $2.80 / Rice

  • MOQ:

    MOQ1Rice

  • Total:

    10000Rice

  • Address:

    HenanZhoukou

  • Delivery:

    3days

  • View More

Description

F-Type Cantilever Sign Post, Standard Style


Product Name: Cantilever F-Type (4.0X2.4m) Sign, Single Arm Sign Post


Panel size: 4000mm (width) x 2400mm (height) (Custom sizes available upon provided drawings)


Product Material: Assembly Molding Board/Extrusion Molding Board, 80/100mm Aluminum Channels, with Class IV Super Strong Reflective Film/Engineering Grade Reflective Film


Bolt Specifications: Column Φ273x8.0x7850mm, Beam Φ133x6.0x4241mm, Flange: 500x500x20mm


Foot bolts: 12 pcs - M27x1500mm, Base flange: 500x500x10mm


Rod Shape: Round Tube


Heat Dip Galvanized Rod


温馨提示:Warm reminder:


When installing F-type cantilever sign posts, choose a time with low traffic flow for installation, and take proper safety isolation measures. Control traffic in the construction area, place warning signs, and remind drivers to exercise caution and drive slowly.


Prepare installation tools: nut drivers, expansion screws, hammer, wrench, tape measure, etc.


Installation of F-type cantilever sign post:


Step 1: Foundation Base Production for Sign Pole: Traffic control in construction area, layout, and determination of base position; then manually assist with small machinery to excavate the pole foundation pit, after excavation, lower the foundation cage, and insert the base flange and foot bolts into the correct position; during concrete pouring, ensure the base flange elevation is accurate, maintain levelness and verticality; maintain the poured concrete foundation, and before completion, fill and compact the pillar foundation pit to meet the required anchor base bearing capacity.


Step 2: After the concrete base has cured, establish safety isolation. Transport the signboard, upright post, and crossbeam to the site. Implement traffic control in the construction area. Assemble the crossbeam and upright post on-site, then install the signboard on the crossbeam.

Step 3: After assembling the sign pole and signboard, use a crane to lift the pole and position it above the foundation base flange. Then lower it to align and overlap the base flange of the pole with the foundation base flange.


Step 4: Thread the nut onto the base bolt, then tighten with a wrench, backfill the soil, and the installation is complete.


Step 5: Clear the site and then withdraw.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $2.80 / Rice
Sales None
Delivery HenanZhoukou3dayswithin
Stock 10000RiceMOQ1Rice
Brand Central for Traffic
Product Specifications Rice
Inventory Quantity 10,000
Price Reasonable and fair
Expiry Long Valid
Update 2024-10-29 17:49
Gallery

Zhongzhou for Traffic Facilities Engineering Co., Ltd.Published byF-Type Cantilever Traffic Sign PostGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top