Epoxy glass flake heavy-duty anti-corrosion coating
Introduction: High solid content, environmentally friendly epoxy modified flake glass coating
Key Performance: A coating containing finely arranged glass flake scales that are mutually overlaid.
— Acid, alkali, salt, water, and oil resistance properties
Excellent corrosion-resistant medium permeability
Design Purpose: Long-lasting heavy corrosion protection for urea granulation towers, synthetic desulfurization towers, offshore platforms, wastewater treatment, and environmental protection, chemical, marine, oil field, and shipbuilding industries.
Corrosion and waterproof protection for facilities and equipment in environmental protection, construction, metallurgy, and chemical industries.
Physical Parameters: Base Coat (Iron Red), Intermediate Coat (Grey), Top Coat (Various Colors)
Density: (1.2-14) g/m², (12-14) g/m², (1.0-12) g/m²
Installation Instructions
Flash Point: Not less than 26℃
Touch dry: (20-30)℃(1.0-20)h
Fully cured: 7 days
Curing Agents: G-05 (Base Coat), G-06 (Mid Coat), G-07 (Top Coat)
Blend Ratio Base Material: G-05 = 100:13 (Cured for 20 minutes) Base Number: G-06 = 100:13 (Cured for 20 minutes)
Base Material: G-07 = 3:1 (Aged for 20 minutes)
Application Method: Brush coating
Diluent: X-117
Bulk Quantity: 5%
Mixed Use Duration: 8h
Recoat Interval: Less than 24h (20%), Large (see notes)
Installation Instructions: The construction surface must be clean and dry. The surface treatment for rust removal should meet CB standard T2 or B2 level. The surface temperature should be above the dew point to prevent condensation of moisture. It should be noted that temperatures at or below the freezing point can cause the surface to freeze, affecting the adhesion of the paint film. The paint itself...
The temperature should be above 15°C to ensure normal construction performance. During construction in confined spaces and during the drying period, it is advisable to ventilate extensively.
Coating: Epoxy glass flake anti-corrosion coating system.
Note: The film thickness can be adjusted as needed, but it will correspondingly change the amount used and affect the drying time. The coating film may discolor during use.
In conditions of immersion, heavy fog, extreme temperature variations, chemical erosion, or abrasion, the minimum recoating interval should not exceed 72 hours.
If the surface is contaminated, clean it with high-pressure freshwater before recoating, allowing it to dry naturally. If the recoating interval exceeds the heavy weight, sanding is required.
Coarse surface to ensure good adhesion between paint films.
Note: This JINGJIA is suitable for metal structure surfaces that are resistant to high-temperature corrosion, after sandblasting or equivalent sandblasting treatment.