Sichuan Shuijian Construction Engineering Co., Ltd.VIP

沉管施工、水下管道安装、水下取水头安装、小型沉船、沉物打捞工程和其它水下工程。
Enter Shop

Pipe extraction and drainage installation, pipeline laying company, underwater pipeline construction

平台认证
  • Unit Price

    $999.00/Rice

  • Brand

    Sichuan Water Construction

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



四川水建建设工程有限公司

VIP   数字营销第2年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    Sichuan Water Construction

  • Unit Price:

    $999.00 / Rice

  • MOQ:

  • Total:

    0Rice

  • Address:

    SichuanChengdu

  • Delivery:

    0Hours

  • View More

Description

The installation of drainage pipes is a process involving multiple steps and precautions. Below is a clear, itemized, and summarized procedure for the installation of drainage pipes:

I. Preparations

  1. Design Drainage System: Design a rational drainage system based on the structure of the building and the areas requiring drainage, determining the pipeline layout, diameter, and material, etc.

  2. Preparation: Clear the construction area, prepare the required materials and tools, such as pipes, connectors, bolts, rubber washers, diving equipment, lifting equipment, etc.

II. Installation Process

  1. Ground Treatment: Punctures holes along the pipeline path on the ground according to design requirements, to facilitate subsequent pipeline installation work.

  2. Lay drainage pipes: Install the drainage pipes section by section according to the designed pipeline alignment. During the installation process, ensure the connections are secure to prevent leaks. For buried pipes, also make sure the pipes are sufficiently covered with soil to meet frost and pressure resistance requirements.

  3. Install brackets and secure pipes: Mount brackets and secure pipes onto the laid drainage pipes to ensure stability and safety. For vertical pipe installation, pay attention to align the tee outlet with the horizontal pipe direction and maintain a distance of 20-50mm between the outer edge of the vertical pipe socket and the facing.

  4. Connect drainage equipment: Attach the drainage pipes to the corresponding drainage devices, such as the sewer or kitchen sink, etc.

  5. Fastener Installation: At pipe connection points, such as between pile caps and piles, and pipe supports and clamps, use bolts and nuts for securing to ensure stable pipe connections.

  6. Sealing Treatment: For interfaces requiring sealing, such as between flange joints and pipes, use rubber rings and rubber gaskets for tight compression to ensure tightness.

3. Post-Production Inspection and Testing

  1. Inspect Installation Quality: Ensure all connections are secure, seals are tight, pipes are level, brackets are sturdy, etc.

  2. Conduct ball run test: For drainage main and horizontal trunk pipelines, perform a ball run test with a ball diameter not less than 2/3 of the drainage pipeline diameter. The ball run rate must meet the standard to ensure the pipeline is unobstructed.

  3. System Testing: After the installation of the drainage pipes is completed, conduct system testing. Check if the drainage system is functioning properly and for any leaks or other issues by releasing water or using other methods.

4. Cautionary Notes

  1. Adhere to safety regulations: Strictly follow safety operation procedures throughout the installation process to ensure the safety of personnel and equipment.

  2. Control Material Quality: Select reliable pipes and fittings to ensure the service life and safety of the pipeline system.

  3. Be mindful of environmental protection: During construction, take care to protect the surrounding environment and avoid polluting soil, water sources, etc.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $999.00 / Rice
Inquiry None
Delivery SichuanChengdu
Brand Sichuan Water Construction
Service Duration 24/7 online
24/7 customer service hotline 137-3947-3999
Service Scope Nationwide installation available
Expiry Long Valid
Update 2024-05-28 15:45
Gallery

Sichuan Shuijian Construction Engineering Co., Ltd.Published byPipe extraction and drainage installation, pipeline laying company, underwater pipeline constructionGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top