Before the design and construction of a cleanroom, the following information and data typically need to be collected:
1) Cleanroom factory requirements for process: temperature and humidity, cleanliness, pressure, noise, vibration, wind speed. Process conditions: equipment layout, room size and name, arrangement, number of people, equipment heat output, dust generation, exhaust air volume, harmful gas composition, concentration, and treatment methods.
2) Building Conditions: Floor, elevation, and section drawings, ceiling heights, structural types, thermal data of construction materials, import/export locations and sizes; mezzanines, partition walls, corridors, shafts, etc.
3) Weather Conditions: Meteorological conditions at the construction site (temperature, humidity, pressure, wind speed, atmospheric dust concentration), as well as the pollution around the location.
4) Other: related information on plumbing, gas-powered, electrical, and other specialized areas.
Dongguan Pengyu Purification Equipment Co., Ltd. is a comprehensive professional air conditioning purification engineering company that integrates design, construction, installation, manufacturing, debugging, and trade. We have extensive and friendly cooperative relationships with high-tech enterprises across the country. The company boasts a competent team of scientists and engineers, skilled equipment manufacturers, and an excellent engineering installation crew, with a strong technical force and excellent corporate quality. We provide reliable engineering (product) quality and comprehensive after-sales service. Through engineering practice, we have formed a united and innovative professional team with strong cohesion, accumulating rich experience in design, production, and construction. Our company has provided a range of services including purification air conditioning design and installation, equipment matching, purification decoration, and system maintenance in numerous projects, earning deep trust and praise from customers. Guided by the principle of "high quality, high technology, and pragmatic approach," we will provide high-quality services for your business, and it is our greatest honor to collaborate with you!
The company's main business scope:
10,000-10 grade cleanroom, design and installation of temperature-controlled factory building.
2. Central Air Conditioning Projects, Mechanical and Electrical Engineering Design, Installation, Maintenance, and Service
3. Static Dissipative PVC, Epoxy Self-Leveling Floor Installation Services.
4. Factory ventilation project, factory hot water system, low-voltage electrical installation.
5. Various steel structure factory design, installation, and construction for water and electricity installation and factory renovation.






























