During the installation of rainwater and sewage pipelines, they should be straight, stable, and have even seam widths. There should be no backflow at the bottom of the pipes, no debris inside, and the centerline position should allow an offset of less than 15mm. The internal bottom elevation of the rainwater and sewage pipeline is a key inspection item, with an allowable deviation of ±10mm. The pass rate must meet the required standards.


























