Heater Roll Welding Machine Operation Instructions
1、 Working Voltage: Three-phaseAC380V +10% ,50Hz + 1%。
2、 Work Environment:No icing at 0-45°C, no condensation at humidity ≤ 85%.
3、 Maintenance: Add lubricating conductive grease per shift3 times; clean the water circulation filter daily; clean the water tank sediment every 3 days; change the water every 20 days; use pure water for cooling in summer and antifreeze for cooling in winter; replace the transmission gear oil monthly; clean dust daily.
4、 Operation Method: After selecting the processing specification, the welding machine automatically applies pressure, rotates, welds, and stops when the foot switch is closed. The work stops when the foot switch is closed, and all actions are disconnected.
5、 Work must be performed wearing a spark-proof protective device to prevent personal injury.
6、 Welding machines generate high temperatures, causing the conductive copper wheels to wear over time. If the copper wheels deform, accumulate slag, or require adjustments, they should be replaced or corrected promptly during operation.
7、 Cooling water chiller operating voltage: Three-phase, four-wireAC380V + 10% ,50Hz + 1%。
8、 Chiller operates normally during operationPerform R134a refrigerant top-up every 3 months.
9、 Extended downtime, please drain the water from the water-cooled unit to ensure the chiller is dry.
10、 High-pressure gauge less than2.6mpa。
11、 Low rolling gauge0.2mpa。
12、 In case of other emergencies, please shut off the power and contact the person in charge.

































