Installation Requirements for Glass Mixing Machine:
Ensure the cylinder is in a horizontal position during the installation of the complete unit.
2. The total height of the machine is 3368mm, designed for n-layer installation with n-1 layer discharge. This is like raising the n-layer discharge foundation, plus an additional 300mm for the motor removal, and the necessary installation height. Please calculate the factory height for the sodium silicate raw material glass blending machine.
3. When installing and using electrical control, please note the following points:
(1) Decide whether to start the main motor once or in stages based on the user's power grid conditions.
(2) Inspect the control switches in the electrical control box for proper functioning.
(3) Verify the settings of the two LX12-121 limit switches on the discharge door to ensure the door opens and closes properly. Replace immediately if any anomalies occur.
(4) Cylinder controlling the opening and closing of the material door; when an external air source is connected, the user should add a control panel (pressure stabilizer). For the spray process (which requires heated water), the user should consider this independently.