Hubei Kangshang Construction Engineering Co., Ltd.VIP

强夯
Enter Shop

How much is the price per square meter for the dynamic compaction?

平台认证
  • Unit Price

    $10000.00/Piece

  • Brand

    Kangshang Construction

  • MOQ

    1Piece

Contact
Leave Msg

Platform Service

Supplier Verified



湖北康尚建设工程有限公司

VIP   采商通第3年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Kangshang Construction

  • Unit Price:

    $10000.00 / Piece

  • MOQ:

    MOQ1Piece

  • Total:

    99999Piece

  • Address:

    HubeiWuhan

  • Delivery:

    3days

  • View More

Description








Common issues encountered during the preloading construction of foundation treatment

(1) Ramming Energy Control. Due to the regional convergence of production, impact machinery and components are frequently rotated between job sites, leading to easy long-term wear and quality degradation of the ramming machines. Additionally, situations with incorrect drop distances frequently occur during construction, which can affect the ramming hammer's impact capability. Therefore, it is necessary to inspect the quality and drop distance of the ramming hammer before operation to ensure it meets the planned requirements.

(2) Preparation and acceptance of the construction plan. Due to the experimental advancement of the intensive strike work locally, the construction skill managers' understanding of the intensive strike is constrained, and comprehensive consideration cannot be avoided. The supervisor must meticulously inspect the construction plan. For example, during the review of this project's plan, the supervisor found that the construction team had not considered the potential adverse effects that the adjacent North Loop might cause. Therefore, the construction team adopted measures such as setting up shock-absorbing ditches (1M wide, 1M deep), installing safety fences on the street side (to prevent flying stones and slurry damage), etc. Additionally, the purpose is to ensure safety during construction and minimize the impact on surrounding buildings.

(3) Compaction Point Alignment Errors. It is common for construction to encounter alignment errors with compaction points. During supervision and monitoring, the standards are enforced to remind construction personnel to recheck each compaction point alignment. After the compaction points are completed, inspect their positions and correct any errors or leaks promptly.

(4) "Rubber clay" treatment. During construction, rubber clay was encountered in some areas, primarily due to the influence of local aggregated precipitation, resulting in a high water content in the surface soil of the foundation. The treatment involves excavating part of the rubber clay, filling it with a mixture of large stones from the nearby leveling project, and starting construction from the very beginning.



Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $10000.00 / Piece
Sales None
Delivery HubeiWuhan3dayswithin
Stock 99999PieceMOQ1Piece
Brand Kangshang Construction
Manufacturer Kangshang Construction
Is negotiation possible? Negotiable
Sample Support Negotiable
Expiry Long Valid
Update 2023-10-14 14:28
Gallery

Hubei Kangshang Construction Engineering Co., Ltd.Published byHow much is the price per square meter for the dynamic compaction?Gallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top