Texas Shituo Air Conditioning Equipment Co., Ltd.VIP

风机盘管 空调机组 工业暖风机 高大空间采暖机组 空气幕 消防排烟风机 3C排烟风机 防火阀 数字化节能风机 边墙风机 轴流风机 离心风机 混流风机 斜流风机 柜式离心消防排烟风机箱 排烟阀 静压箱 风机箱等中央空调主机末端通风配件
Enter Shop

4P Vertical Cabinet Air Conditioner/4P Vertical Ceiling Fan Coil/4P Water-Cooled Vertical Cabinet Fan Coil Air Conditioner Installation and Operation Instructions

平台认证
  • Unit Price

    $1698.00/Tai

  • Brand

    World拓 Air Conditioning

  • MOQ

    1Tai

Contact
Leave Msg

Platform Service

Supplier Verified



德州世拓空调设备有限公司

VIP   数字营销第4年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    World拓 Air Conditioning

  • Unit Price:

    $1698.00 / Tai

  • MOQ:

    MOQ1Tai

  • Total:

    10000Tai

  • Address:

    ShandongDezhou

  • Delivery:

    3days

  • View More

Description

    In our previous article, we learned about the specifications, installation requirements, procedures, and precautions for installing fan coils. However, we believe you haven't seen the installation, operation, maintenance, and precautions for wall-mounted fan coils. Today, we're joined by Dezhou Shituo Air Conditioning Equipment Co., Ltd., a manufacturer of wall-mounted fan coils, to provide you with water-cooled fan coils. We will cover the installation, operation instructions, precautions, and product maintenance for the wall-mounted fan coil units. Below is the detailed explanation. It's also important to know that water-cooled wall-mounted fan coils are also known as fan coil units, air-cooled fan coils, water-cooled wall-mounted fan coil air conditioners, water-cooled fan coils, water-cooled fan coil units, and fan coil air conditioners, among other product names. Let's first look at the product installation and operation instructions.

One,Standing cabinet air conditioner / Vertical fan coil unit / Water-cooled cabinet fan coil unit installation and operation instructionsUser Manual

 Preface: This manual includes instructions for proper installation, adjustment, and maintenance. Please read this installation and operation manual carefully before starting or inspecting the unit. During the installation, operation, and maintenance processes, operators or maintenance personnel may come into contact with certain components or environments, such as moving parts and high/low voltage power sources. Improper handling may result in personal injury. Operators or maintenance personnel are responsible for being aware of these potential hazards, taking proper precautions, and ensuring safe operation. Shenling Company shall not be held liable for any personal injury or equipment damage caused by improper installation, adjustment, use, and maintenance by the user, or failure to follow the instructions in this manual.

All units undergo rigorous coiling pressure tests before leaving the factory, including dynamic and static balance adjustments of the fan, air volume and cooling capacity tests, noise tests, electrical performance tests, and appearance quality inspections. Only after all indicators meet the required standards can the units be shipped. The units can meet the design requirements under proper installation and usage conditions.

Part TwoRack-Type Air Conditioner / Vertical Fan Coil Unit / Water-Cooled Rack-Type Fan Coil Unit Installation and Operation InstructionsManual Update

Our company is committed to continuously improving and optimizing our products. Should there be any changes to the content in this manual, we apologize for not notifying you separately. If needed, you may request relevant materials from our company or a local office.

Inspection of the Assembly Unit

The equipment must be inspected within 15 days upon arrival. Check for any damage to the equipment's appearance before unloading and verify that all components listed on the packing list have been received. In case of any missing parts, please notify the carrier and our local office in writing within 72 hours.

Aviation Unit Storage

Customers are responsible for the proper storage and installation of the equipment upon receipt.

* Notice:

If the equipment needs to be stored before installation, the following precautionary measures should be taken: Ensure that all openings such as water pipes and copper pipes are covered with protective caps.

Store the equipment in a dry, vibration-free area with minimal human activity.

When stored outdoors, please ensure there is a rain protection measure in place. Do not expose to direct sunlight.

Equipment handling, hoisting

During the handling or hoisting process, maintain the aircraft's balance, ensure the cable is secure, and the angle between the cable and the horizontal is no less than 60 degrees. (See the aircraft packaging and transportation label for details.)

Section 3Rack-type Air Conditioners/Vertical Fan Coils/Water-cooled Air Conditioner Rack-type Fan Coil Units Installation and Operation InstructionsInstallation and installation space

Ensure there is ample space around the unit installation for operation and maintenance, with unobstructed airflow and no short circuits. 1) Check the lifting system's performance to ensure it can support the unit's weight (refer to the label for the unit weight). 2) Ensure there is sufficient space around the unit for the removal of the maintenance door and filter mesh. 3) Confirm there is enough space around the unit (L≥700mm from the wall) for connecting the in and out water pipes. 4) Ensure there is enough space around the unit for replacing belt pulleys, motors, coils, etc. 5) The height of the unit installation foundation should allow for the installation of condensate traps. 6) Verify that the installation foundation platform can support the unit's normal operating weight, and maintain appropriate flatness and levelness. 7) For ceiling-mounted units, ensure the strength of the hanger and secure installation.

8) For suspended ceiling units, the units are horizontally suspended within the ceiling, with the suspension rods perpendicular to the unit's bottom bracket and nuts securely tightened. After installation, ensure the unit is properly leveled. The unit must not bear the weight of external water and air ducts; please refer to the engineering installation standards for details.

1) The water and steam coils are standard accessories, equipped with external threaded coil connectors. 2) During installation, avoid tightening the coil connectors too much to prevent damage to the coil drain pipes and connectors. 3) Valves must be installed on the in and out water pipes outside the unit to regulate flow and cut off the cold and hot water sources during maintenance. Additionally, insulate the in and out water pipes. 4) For units with two or more in and out water pipes, please connect in parallel when connecting the pipes. 5) A drainage bend should be installed before the steam coil to ensure normal condensate discharge and prevent water hammer damage to the coil. The pressure after the pressure reducing valve (i.e., the coil pressure) must not exceed 0.3MPa. 6) The weight of the water and steam pipes connected to the unit must not be borne by the unit.

1) The air duct installation includes a flexible connection pipe (such as a bellows or canvas pipe) at the outlet of the air conditioner to reduce noise and vibration, with the air volume control valve installed after the flexible connection pipe. The weight of the air duct connected to the unit must not be borne by the unit. 2) There should be a straight pipe section 1.5 to 2.5 times the length of the outlet edge at the air conditioner outlet to reduce eddies. If space constraints prevent meeting these requirements, the bend direction of the outlet pipe should follow the rotation direction of the fan impeller, or guide vanes should be added to the bend pipe. 3) The bend section of the air duct should use a large curvature radius r, commonly r/b = 1.5 to 2.0 (where b is the width of the air duct). Guide vanes should be installed when r/b is less than 1.0 to reduce resistance. 4) The expansion angle of the expansion pipe when the air duct cross-section increases should be as small as possible, less than 20°; the contraction angle of the contraction pipe when the air duct cross-section decreases should be as small as possible, less than 45°. 5) The supply and return air outlets should not be too close to avoid short-circuiting of the air flow. 6) When the air duct is long and there are many branches, the resistance of each branch should be balanced as much as possible to avoid uneven air volume. 7) Suitable insulating materials should be selected for the air ducts; please refer to the relevant manual for selection. Additionally, insulating materials should also be applied to the indoor supply outlets to prevent condensation droplets from affecting aesthetics. 8) When used as a fresh air unit, a sealed insulating air valve should be installed on the fresh air duct. 9) For mixing new and return air, the fresh air duct can be connected to the return air duct. 10) The connection between the unit's intake and exhaust outlets and the air duct should be made using a flexible joint.

*Warning: Do not operate the machine before connecting the duct; do not disconnect the duct while the machine is running.

Section 4:Floor-standing Air Conditioner / Vertical Fan Coil Unit / Water-cooled Floor-standing Fan Coil Unit Installation InstructionsThe introduction of the fan coil unit manufacturer, Dezhou Shituo Air Conditioning Equipment Co., Ltd., is complete. Should you require product pricing, quotes, selection, design, specifications, and dimensions, please feel free to call us at any time.















Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $1698.00 / Tai
Sales None
Delivery ShandongDezhou3dayswithin
Stock 10000TaiMOQ1Tai
Brand World拓 Air Conditioning
Product Features Heating and cooling unit
Type Floor-standing fan coil unit
Custom Processing Is
Expiry Long Valid
Update 2023-03-01 17:13
Gallery

Texas Shituo Air Conditioning Equipment Co., Ltd.Published by4P Vertical Cabinet Air Conditioner/4P Vertical Ceiling Fan Coil/4P Water-Cooled Vertical Cabinet Fan Coil Air Conditioner Installation and Operation InstructionsGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top