Nanjing Pinlan Environmental Protection Equipment Co., Ltd.VIP

环境保护设备制造、环保工程设计施工、机电工程维修安装、市政公用工程施工
Enter Shop

Integrated pump well for municipal pipeline pressure boosting and interception

平台认证
  • Unit Price

    $41000.00/Tai

  • Brand

    D

  • MOQ

    1Tai

Contact
Leave Msg

Platform Service

Supplier Verified



南京品蓝环保成套设备有限公司

VIP   标王第4年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    D

  • Unit Price:

    $41000.00 / Tai

  • MOQ:

    MOQ1Tai

  • Total:

    5Tai

  • Address:

    JiangsuNanjing

  • Delivery:

    Pre-sale, after payment20days

  • View More

Description

Product Introduction:

An integrated pump well is a device for lifting wastewater, rainwater, drinking water, and sewage for drainage, which is a new generation of environmentally friendly pump station designed, manufactured, and assembled centrally by the factory, then delivered to the site for installation as a turnkey project.

An integrated control cabinet can perform the following functions: calculate the inflow and outflow of wastewater, automatically empty it daily, and notify for maintenance and service.

Product Significance

By leveraging its primary performance, it can improve the changes in the surrounding environment, effectively promoting the application of the integrated pump well as a whole, thereby bringing people a high-quality living environment.

(2) Enhanced the living advantages brought by environmental changes through increased equipment usage, offering more advanced ideas for optimizing settings in many aspects of using this equipment.

(3) Prefabricated pumping stations can effectively treat wastewater without the need for human labor, significantly optimizing the construction of environmental spaces and achieving excellent wastewater treatment results.

(4) Macroscopically, the pump station's practicality has already clearly demonstrated its superiority. To better implement usage, it can effectively reduce the occupied space.

ProductSelect

The form of an integrated pump well should be selected based on a comprehensive assessment of factors such as the geographical location, terrain conditions, and geological situations.

2 The pump station site should have necessary traffic conditions and construction hoisting operation conditions.

The design of pre-fabricated pump stations should be determined based on the corresponding pipeline construction plan of the engineering location, in conjunction with the scale of water supply and drainage projects, as well as near-term and long-term construction conditions, after a technical and economic comparison.

4 The pump station should determine an appropriate engineering scale in combination with the principles of near and long-term planning.

5 The pump station layout should comply with the following regulations:

(1) Submersible auto-transformer mounted pump, where the flat layout does not need to consider the pump maintenance space, only meeting the pump installation and hydraulic flow requirements.

(2) Dry-installation pumps should consider the installation of the pump and the flow state requirements of the pump suction pipeline in the flat layout.

(3) When matching a pump with a forced-air-cooled motor, the pump station layout should also meet the pump's heat dissipation requirements.

(4) The modular wet well pump station should have dimensions and layouts that meet the installation, lifting, and daily operation requirements for the main equipment such as pumps and gratings.

(5) The modular integrated pump station wet well must meet the flow requirements of the pump suction pipe and the installation, lifting, and daily operation requirements of the grate.

(6) Modular integrated pump station dry well should have dimensions that meet the installation, heat dissipation, maintenance, and daily operation requirements for pumps and control cabinets.

(7) Modular integrated pump stations should be equipped with a water collection pit and drainage pump within the dry well to remove accumulated water inside.

(8) The control cabinet can be installed inside the dry well of a pump station or on the ground. If installed inside the dry well, ventilation, heat dissipation, and dehumidification should be considered.

(9) When a pump station utilizes a combination of multiple wells, the layout should meet the overall installation and operational requirements of the pump station. It is advisable to install the same model and quantity of pumps within each well.

 


Equipment Installation

Be cautious of potential embankment collapse; the planned geological survey report will help understand the consequences after excavation.

2. Whenever possible, utilize track transport or mechanical excavation to avoid risks to personnel.

3. Reserve a safe distance at the edge of the integrated pump well pit for equipment maintenance.

4. Ensure the safety of personnel within the scope of work.

5. No persons are allowed under lifting machinery.

6. Electrical installations must be performed by qualified professionals.

ProductGuidance

1. Responsible for free installation, debugging, and operation guidance for the equipment ordered by the user until it runs smoothly.

2. Provide users with free training services on basic operation and routine maintenance at the installation site.

3. Provide warranty services for the equipment of this project in accordance with the original manufacturer's warranty terms, starting from the date of equipment acceptance.

4. Free upgrade from standard factory warranty service to on-site warranty service.

5. Offer free upgrade from standard manufacturer's warranty to lifetime warranty. For equipment outside the warranty period, charge only for the cost of faulty parts, excluding labor fees.

6. Response time for service is 4-8 hours, within法定 working days, users in East China can reach the fault site within 4 hours, while other users can arrive at the fault site within two working days.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $41000.00 / Tai
Sales None
Delivery JiangsuNanjingPre-sale, after payment20dayswithin
Stock 5TaiMOQ1Tai
Brand D
Customized Processing Certainly
Treat wastewater volume 2000
Model YZBZ
Expiry Long Valid
Update 2023-02-24 21:29
Gallery

Nanjing Pinlan Environmental Protection Equipment Co., Ltd.Published byIntegrated pump well for municipal pipeline pressure boosting and interceptionGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top