Xinhe County Ruixin Hydropower Machinery FactoryVIP

启闭机、闸门、卷扬机、拦污栅、清污机、橡胶止水、污水处理设备、水泵、电机、阀门、起重设备、桥梁支座、桥梁伸缩缝、土工布、土工膜、泡沫板 生产、销售、安装
Enter Shop

Manual Hoist Winch - Ruisen Hydraulic Machinery - Factory Direct Price, Discounted, Installation and Commissioning Included

平台认证
  • Unit Price

    Negotiable

  • Brand

    Ruisen

  • MOQ

    1Vehicle

Contact
Leave Msg

Platform Service

Supplier Verified



Xinhe Ruixin Hydraulic Machinery Factory

VIP   数字营销第4年
资料通过中商114认证
Recommend

Product Details

Specs

Gallery

  • Brand:

    Ruisen

  • Unit Price:

    Negotiable

  • MOQ:

    MOQ1Vehicle

  • Total:

    999Vehicle

  • Address:

    HebeiXingtai

  • Delivery:

    3days

  • View More

Description

Once the winch equipment is set up, it is necessary to conduct inspections and adjustments.

1. Open Gear Drive CM02, with a tooth side clearance of 0.42mm, the contact area along the tooth height is not less than 40%, and along the tooth length is not less than 50%.

2. Inspect the operation of the brake system's transmission components for smoothness and reliability, and adjust the clearance between the brake shoe and the brake wheel during release to not exceed 0.7-0.8mm.

3. Inspect that all transmission systems of the safety brake are smooth and secure, and adjust the clearance between the brake shoe and the brake wheel during release to not exceed 1.5mm.

4. Verify that the control electrical components for the working brake and the safety brake are interlocked with the main motor. Suggest that the main motor's working brake is disengaged, and the auxiliary motor's working brake is engaged. Additionally, only disengage the safety brake to adjust the main motor.

Smooth winch

1. Select winter gear oil or full cylinder oil for the reducer to ensure smooth operation; the oil level must ensure that the worm shaft is fully immersed in the oil. Change the oil for the reducer once a year.

2. The main shaft bearings and the output shaft of the reducer should be timely replaced or supplemented with No. 4 calcium-based grease, and the oil should be changed every two years.

3. Prior to each drive, lubricate the open gears with smooth oil.

4. Any other smooth areas should be lubricated before each operation, especially the thrust rings between the two gears on the reducer output shaft and the sleeve of the sliding gear should be lubricated with grease.

Winch trial operation

Winch equipment is complete and, after inspection and adjustment, confirmed to be free of errors. It can then be lubricated on all smooth parts, subjected to a no-load test operation, followed by load operation after circling, gradually loading up to the rated load. Under standard voltage, the current does not exceed the rated value, and there is no heat generation in the motor, reducer, and other parts.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery HebeiXingtai3dayswithin
Stock 999VehicleMOQ1Vehicle
Brand Ruisen
Custom Processing Is
Applicable Fields Mining
Traction 140 (KN)
Expiry Long Valid
Update 2022-12-06 18:03
Gallery

Xinhe County Ruixin Hydropower Machinery FactoryPublished byManual Hoist Winch - Ruisen Hydraulic Machinery - Factory Direct Price, Discounted, Installation and Commissioning IncludedGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top