Foshan Puliang Electronics Co., Ltd.VIP

静力水准仪,沉降监测,倾角传感器,压力变送器,压力传感器,液位变送器,自动化物联网监控
Enter Shop

Magnetic Inductive Hydrostatic Leveling Instrument Settlement Monitoring System SZY20

平台认证
  • Unit Price

    $50000.00/Set

  • Brand

    Standard Quantity

  • MOQ

    1Set

Contact
Leave Msg

Platform Service

Supplier Verified



佛山市普量电子有限公司

VIP   数字营销第4年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Standard Quantity

  • Unit Price:

    $50000.00 / Set

  • MOQ:

    MOQ1Set

  • Total:

    100Set

  • Address:

    GuangdongFoshan

  • Delivery:

    Pre-sale, after payment15days

  • View More

Description

Magnetic Inductive Hydrostatic Leveling Instrument Subsidence Monitoring System

One,Magnetic Resonance Hydrostatic Leveling Instrument Settlement Monitoring System Overview:

Magnetic induction static level gauge settlement monitoring systems are applied in ground, foundation pits, tunnels, tracks, high-speed rail, highways, cultural relics, high-rise buildings, mountains, slopes, dams, power stations, bridges, base towers, large-scale storage tanks, and amusement park infrastructure, among other locations.

Throughout the entire process from construction to the end of use, we aim to meet the designed quality standards and ensure safe operation.,Attempt to extend the service life as much as possible. The main focus of the engineering settlement monitoring is to forecast excessive vertical deformation, sinking, or floating of the building during the construction and use of the main structure, promptly feedback the safety status of the building, ensuring safety and reliability. It also provides theoretical basis and experience for future engineering design.

(I) Purpose of settlement monitoring

     1Evaluate the safety status of the project based on the data analysis of on-site settlement monitoring.

     2Based on data collection, analyze and predict monitoring data, issue early warnings and alarms, and promptly submit settlement monitoring and analysis reports to the owner, supervisor, construction unit, and safety management team, providing technical support for safety management decision-making.

     3Accumulate data and materials to provide experience for future engineering design and construction.

     4Settlement monitoring data, after analysis, processing, necessary calculations, and judgments, is used for quality prediction and feedback in construction.

The Significance of Settlement Monitoring

     1Utilize modern information technology to guide construction and provide reliable and continuous settlement monitoring data.

     2Timely organize monitoring information, establish feedback data through data processing, compare field measurement results with predicted values to determine if the safety condition of the project meets the expected requirements.

     3Through engineering settlement monitoring, ensure building safety, and also compare the monitoring results with theoretical predicted values. Utilize reverse analysis to seek theoretical formulas closer to reality for guiding other similar projects.

Two,Magnetic Resonance Hydrostatic Level Gauge Subsidence Monitoring System Framework and Composition:

(I) Framework Diagram

(II) System Composition:

1Magnetic Inductive Hydrostatic Level Gauge PT500-SZY20      Quantity: Several (at least)2Set above);

24GWireless Data Collection Module PT500-990            Quantity:1Unit (recommended number of access points per unit less than)64);

3Cloud Server                                          Quantity:1Set (available with third-party);

4Cloud Monitoring Platform                                      Quantity:1Set (available from third parties)

5Power Supply                                                Quantity:1Set24VDCOr220ACCompatible;

6Outdoor Electrical Box                                          Quantity:1Piece(s)

710mmFluid Tube                                      Quantity: Several meters (as calculated by the current project site distance)

8Communication Cable                                         Quantity: Several meters (as calculated based on the current on-site project distance)

9Cable protection conduit                                      Quantity: Several meters (as calculated by the current project site distance)

10Conduction mediumWater or AntifreezeQuantity: Several liters (based on the current project site distance)


One、Magnetic Inductive Static Level Gauge Settlement Monitoring System Performance Parameters:

(1) Principal Performance Parameters of Hydrostatic Level Gauge

1、  Settlement Range:0-100mm200mm300mmOptional

2、  Overall Accuracy: ±0.1mmAbsolute Pressure Accuracy

3、  Update Frequency 10Hz

4、  Supply Voltage 24VDC(930VDC)

5、  Operating Current <50mA

6、  Shou    Please provide the Chinese content to be translated into American English. 10010,000 times

7、  Ambient Temperature -4070

8、  Humidity/Dew Point         Humidity90%No condensation allowed

9、  Temperature coefficient <30pp/C

     10IP ratingIP67

(II)4GKey Performance Parameters of Wireless Communication Module

1Operator: China Mobile 4G

2Data Transmission Format: Transparent Transmission/Non-sleeping

3Communication Protocol:MODBUS RS485-RTU

4Number of machine connections:256dot (recommended to be less than)64·

5Power supply:12-24VDC

6Accepts less than transmit current100mA

7With data plan included.500M/Month*3Year

Section 3: Key Performance Parameters of the Cloud Monitoring Platform

1Equipment configuration, collection, and analysis

2Equipment grouping, networking, addition, and deletion management

3Settlement data, real-time data monitoring

4Data statistics, inquiry, download

5Data alert, record, issue to users


Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $50000.00 / Set
Sales None
Delivery GuangdongFoshanPre-sale, after payment15dayswithin
Stock 100SetMOQ1Set
Brand Standard Quantity
Settlement Range 0-100mm
Settling Accuracy 0.1mm
System Power Supply 24VDC/220VAC
Expiry Long Valid
Update 2023-06-25 08:06
Gallery

Foshan Puliang Electronics Co., Ltd.Published byMagnetic Inductive Hydrostatic Leveling Instrument Settlement Monitoring System SZY20Gallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top