Product Information
Product Category: High-Strength Non-Shrink Grouting Material
Brand: Huabao Vision
Type: CGM
Usage: Equipment foundation secondary grouting, anchor bolt grouting, structural reinforcement
Specification: 25kg/bag, 50kg/bag
Origin/Manufacturer: Jining, Shandong
Bonded with special cement as the binder, selected high-strength materials as aggregates, supplemented with high fluidity, slight expansion, and anti-segregation substances. It boasts good fluidity, slight expansion, early strength, high strength, and oil resistance. The comprehensive performance of the series is superior, with a wide range of applications, capable of meeting the construction needs of various grouting projects. It is an ideal material for machinery and equipment, anchor bolts, factory steel structure installation, reinforcement and strengthening projects, as well as emergency repairs for roads and bridges in metallurgy, power, petrochemical, chemical, and light industries. It offers advantages in construction such as reliable quality, cost reduction, shortened construction period, and ease of use.
1. Technical Features: Early strength, high strength, large fluidity (self-flowing), shrinkage-free, oil-resistant渗透
Early and high strength: One day's strength can reach over 28.5MPa, and the equipment can be put into production the day after installation.
2. Self-Flowing: Simply add water, mix, and pour directly into the equipment foundation. No vibration is required to fill all the voids in the foundation.
3. Micro-puffing: To ensure a tight contact between the equipment and the foundation.
4. No Rusting Effect: No rusting hazard for steel bars, steel plates, etc.
5. Oil-Resistant Penetration: After soaking in engine oil for 30 days, its strength is increased by more than 10% compared to before soaking.
Durability: After 2 million fatigue tests and 50 freeze-thaw cycles, the strength shows no significant change.
7. Excellent weather resistance for long-term safe use from -40℃ to 600℃.Section II: Application:
1. Secondary Grouting for Equipment Installation
2. Steel structural column foundation installation
3. Various machinery and electrical equipment with non-slip iron installation and flowing grouting
4. Anchor bolt foundation column grouting, rock foundation grouting
5. Anchor welding of frame structural joints, reinforcement and strengthening of bridge joints
6. Post-tensioned prefabricated component grouting, prestressed bridge joint filling
7. Reinforcement, repair, and modification of concrete beams, slabs, columns, walls, and foundations