Installation Method:
1. Draw a level line according to the required height, ensuring both vertical and horizontal alignments are properly set.
2. Install light steel studs (38 or 50mm studs) at appropriate spacing, typically 1-1.2 meters apart, with hanger distances distributed according to the specifications of the light steel studs.
3. When installing the pipe, gloves must be worn. If fingerprints or stains are accidentally left, they can be washed off with detergent and hot water, then wiped dry.
4. Install the pre-mounted hangers on the joists and attach them along with the square tube joists beneath the light steel joists. The spacing of the square tube joists is generally 1 meter. After full installation, ensure they are adjusted to be level.
5. Install the aluminum panel/wood grain aluminum panel/aluminum panel ceiling series in order by hanging them on the tracks, then press down the stopper. The distance between the ends of the rectangular tube should be maintained at 0mm or 20mm.































