Suzhou Haoren Environmental Protection & Recycling Resources Co., Ltd.VIP

各拆除资质齐全拥有10余项资质,再生资源回收备案,承接各工厂,各化工厂,钢结构,大型会场,展馆,酒店,宾馆,KTV,会所,大型室内外结构等拆除工程。 各种设备库存积压回收:各工厂设备,化工设备,制冷设备,中央空调,大型锅炉,大型变压器、厨房设备,酒店会所KTV设备及物资,工地,码头,加工车间的废料,废金属,电线电缆,电梯拆除回收等。
Enter Shop

Hainan Demolition Company: Factory Demolition and Equipment Disposal

平台认证
  • Unit Price

    Negotiable

  • Brand

    9

  • MOQ

    1piece

Contact
Leave Msg

Platform Service

Supplier Verified



苏州浩仁环保再生资源有限公司

VIP   数字营销第4年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    9

  • Unit Price:

    Negotiable

  • MOQ:

    MOQ1piece

  • Total:

    99piece

  • Address:

    JiangsuSuzhou

  • Delivery:

    3days

  • View More

Description

Hao Ren specializes in dismantling projects for chemical plants, factories, steel structures, large industrial buildings, construction projects, large-scale chemical equipment, large pipeline equipment, pressure vessels, boilers, hotels, large indoor dismantling, inns, and more. Our company has extensive experience in dismantling large steel frameworks in chemical plants and has undertaken numerous dismantling projects. We can select appropriate construction methods based on the characteristics of the dismantling structure and surrounding environment, ensuring quick service, low costs, minimal disturbance to the surrounding area, and safety. We are a specialized dismantling company that undertakes various dismantling projects year-round, combining manual and mechanical dismantling. Our company has professional dismantling staff with years of experience in the industry, offering comprehensive dismantling services, waste removal, and site cleanup.

A chimney appears to have been struck by lightning, resulting in significant damage to the exterior surface, extending up to dozens of meters. Due to this, over 300 residents living near the factory were urgently evacuated. The specialized building demolition team responsible for dismantling the chimney officially began work yesterday and is set to remove the hazardous chimney within 8 days. After the chimney incident, the Wenhua District government and Jingshan Street were highly concerned, deploying 20 security personnel to set up cautionary lines and evacuate nearby residents that night. To date, over 300 people have been relocated, "Many locals in Wenzhou have sought refuge with their relatives, while over 100 nearby migrant workers have been accommodated in nearby hotels." A manager from the Wenzhou Dyeing and Weaving Group Co., Ltd. explained, "Considering the chimney could collapse, residents within nearly 100 meters around the chimney were targeted for evacuation and relocation." He anticipates that residents will be able to safely return to their homes in about a week.

The journalist learned that the chimney, reportedly struck by lightning, currently belongs to Wenzhou Dyeing and Weaving Group Co., Ltd. It is currently in use by Tianmei Dyeing and Weaving Co., Ltd., which leases the factory from the company, primarily for discharging dust and exhaust from boiler combustion. A worker from Tianmei Dyeing and Weaving Co. explained that due to the lightning strike, the chimney is now unusable, and the company has temporarily halted production. "This chimney was originally built by the predecessor of the dyeing and weaving group, Wenzhou Dyeing Factory, in the late 1970s, standing 130 meters tall, and had never been struck by lightning before," a manager from Wenzhou Dyeing and Weaving Group told the journalist. "After the chimney, which has been in use for over 30 years, is demolished, it is very likely that a new chimney will be constructed. Currently, there are two types of chimneys available: stainless steel with water film dust removal and dry spiral dust removal. The type to be built will be decided in consultation with the users." By 6 a.m. yesterday, the emergency rescue team from Wenzhou Gaowei High-altitude Construction Demolition Co. had arrived on site for construction. At the scene, workers were seen in a rush to complete the work, with scaffolding already reaching the sixth floor.

According to a manager at the company, "After receiving the task, we began construction in the morning. To facilitate the work, we first cleared the area around the chimney before proceeding with the construction." It is learned that the contract between the company and the owner stipulates that the entire chimney removal should not exceed 8 days. "We plan to spend two days setting up scaffolding and protective nets, four days dismantling the chimney from top to bottom, and two days cleaning up the construction waste on site." Manager Lu from the company believes that the most difficult part of the chimney removal is the unstable damaged areas, which require minimal震动 during dismantling, posing a challenge throughout the process. "Having removed multiple similar chimneys, we should be able to complete the task well within the 8-day timeframe, ensuring the safety of nearby residents."

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery JiangsuSuzhou3dayswithin
Stock 99pieceMOQ1piece
Brand 9
Manufacturer Hao Ren
Service Content Remove
Engineering Type Remove
Expiry Long Valid
Update 2025-10-22 13:54
Gallery

Suzhou Haoren Environmental Protection & Recycling Resources Co., Ltd.Published byHainan Demolition Company: Factory Demolition and Equipment DisposalGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top