Petroleum chemical project construction dismantling and relocation, hazardous waste treatment in various chemical plants, storage tank and oil tank dismantling and recycling, complete personnel certificates, and full company qualifications. Emphasize safety as the top priority; the safety department and construction supervisors must be on-site throughout the process to ensure the dismantling is foolproof. Secondly, ensure the "dressing" and lifting of tower-type equipment, implement material supply and construction organization on-site, and personnel machinery. Adhere to the principle of installing one unit upon arrival and not storing on-site for delivered equipment, and follow the lifting sequence of large over small and heavy over light. The absorption tower, reabsorption tower, desorption tower, and catalytic cracking reactor are the current focus of lifting. Prepare and organize the lifting process in advance to ensure the project is completed safely and on schedule.
Demolition and relocation services for chemical plants, oil refineries, grease plants, cement factories, fertilizer plants, food factories, with中介 offered for heavy rewards, and equipment packaging and purchase. Ensure the completion of civil engineering and ground pipeline work for catalytic and dual desulfurization units, arrange construction plans for all areas, establish weekly plans, and control daily schedules to secure the final civil engineering project of an 8 million yuan project; fourthly, the assembly, welding, and hoisting of the catalytic "two devices" is a top priority for the construction company, ensuring construction quality and timely hoisting; fifthly, the prefabrication and installation of steel structures, with the pressure-reducing steel structure completed by the Spring Festival, all other main structures fully installed, creating conditions for post-holiday process pipeline installation; sixthly, focus on the completion of steel structures, fire protection, sprinkler pipe installation, and process piping for the 402 tank area, conducting a concentrated, decisive battle.
Overall, we have comprehensive dismantling qualifications for chemical plants, electronic factories, breweries, cement plants, power plants, machinery and electrical factories, steel mills, and fertilizer plants, and are capable of handling the demolition, relocation, and dismantling of various factories upon closure. Ten Construction Company will launch a large-scale installation project, with process pipelines being a major focus post-Spring Festival. It is anticipated that pre-fabrication will commence in full by mid-April. The company has made full use of the one month before the New Year to prepare in advance. In light of the substantial pipeline engineering volume, engineering technicians have early estimated and calculated the total volume, materials, and labor, prepared a demand report for pipeline technicians, and organized specialized sections.
Technical management, material management, quality management, civil construction, safety management, and construction management. Construction leaders, especially those with specialized technical backgrounds, should fully utilize their expertise to assist and support engineering technicians in planning and organizing pipeline construction. Calculate the total amount and convey relevant requirements to the construction teams as soon as possible.






























