Suzhou Haoren Environmental Protection Recycling Resources Co., Ltd.VIP

各拆除资质齐全拥有10余项资质,再生资源回收备案,承接各工厂,各化工厂,钢结构,大型会场,展馆,酒店,宾馆,KTV,会所,大型室内外结构等拆除工程。 各种设备库存积压回收:各工厂设备,化工设备,制冷设备,中央空调,大型锅炉,大型变压器、厨房设备,酒店会所KTV设备及物资,工地,码头,加工车间的废料,废金属,电线电缆,电梯拆除回收等。
Enter Shop

Suzhou Factory Demolition and Equipment Recycling, Suzhou Demolition Company

平台认证
  • Unit Price

    Negotiable

  • Brand

    No content provided for translation.

  • MOQ

    1piece

Contact
Leave Msg

Platform Service

Supplier Verified



苏州浩仁环保再生资源有限公司

VIP   数字营销第4年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    No content provided for translation.

  • Unit Price:

    Negotiable

  • MOQ:

    MOQ1piece

  • Total:

    99piece

  • Address:

    JiangsuSuzhou

  • Delivery:

    3days

  • View More

Description

We are a qualified entity for demolition, with relevant procedures handled by the county or district-level safety supervision department! Chemical plants are categorized into equipment and building demolition, thus requiring two types of qualifications: building demolition and equipment installation. When undertaking demolition projects for building projects, only enterprises with the "Level Three Qualification Standard for General Contracting of Construction Engineering" can take on the work. For structural steel projects, only enterprises with the "Qualification Standard for Contracting of Structural Steel Engineering" can handle the demolition work.

Chemical Plant Demolition Qualification Units: Qualification for demolition contracts primarily depends on registered capital, practicing personnel, engineering and technical management staff, equipment, and performance, with the qualification level determined accordingly. The undertaking of projects should not exceed 5 times the registered capital. The qualification units should be searchable under the construction administration authority. Additionally, the qualification units must possess 3 certificates: High Risk Certificate, Chemical Installation Certificate, and Chemical Demolition Certificate.

1. Factory Demolition: 1. Prior to demolition, a project must be initiated; 2. An investment budget for the demolition is required; 3. A construction plan must be designed and submitted for approval by the "Three Simultaneous" department (safety, environmental protection, and hygiene), and sometimes an emergency response plan is also needed. 4. The demolition team must consist of qualified workers and specialized trades such as welders, electricians, crane operators, etc. A license issued by the Administration for Market Regulation is necessary, with the scope of work covering the petrochemical system. 5. Petrochemicals are flammable and explosive; during demolition, there may be harmful substances like methane and waste oil, so safety must be guaranteed. 6. Building demolition projects must be carried out by entities with爆破 or demolition contracting qualifications, and it is strictly prohibited to subcontract the project illegally. 7. In addition to meeting the requirements of this specification, safety in building demolition projects must also comply with the current national mandatory standards.

1. Prior to workers entering the construction site, the contractor and the factory must jointly conduct special safety education and technical briefing to understand the hazardous factors and preventive measures in the construction process. 2. Nantong Longxiang Chemical Co., Ltd. (hereinafter referred to as Party A) must clearly brief the on-site dismantling materials, assign a liaison person for the briefing, provide drawings that match the on-site condition, and offer the intermediate media for all equipment and pipelines, as well as conduct an on-site briefing. 3. Establish responsibilities for blowing, cleaning, inspection, and confirmation, and implement corresponding fire safety measures. 4. Due to the possibility of residual organic solvents and other flammable and explosive chemicals in the production equipment and pipelines, a process treatment must be carried out before dismantling, such as using steam to blow out the pipelines and equipment inside the unit, and replacing them with inert gases like nitrogen to ensure no residual media. Each stage should have a responsible person and require signature approval.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery JiangsuSuzhou3dayswithin
Stock 99pieceMOQ1piece
Brand No content provided for translation.
Manufacturer Hao Ren
Service Content Remove
Engineering Type Remove
Expiry Long Valid
Update 2025-10-22 13:55
Gallery

Suzhou Haoren Environmental Protection Recycling Resources Co., Ltd.Published bySuzhou Factory Demolition and Equipment Recycling, Suzhou Demolition CompanyGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top