The company holds top-grade qualifications for chemical deconstruction, chemical operation, and dismantling/installation.High-priced dismantling and whole recyclingVariousChemical plants, oil refineries, oil mills, cement factories, fertilizer factories, food additive factories, breweries, electronics factories, pharmaceuticals factoriesFactory, Food Factory, Small Scale Chemical Plant, Starch Factory, Beverage FactoryWait.

Specialized in petrochemical tank relocation, installation, dismantling, and hazardous waste treatment; construction, dismantling, relocation, installation, and hazardous waste treatment for petrochemical projects.We undertake a variety of demolition projects, including building, industrial, factory, billboard, temporary structure, illegal construction, water tower, chimney, and equipment relocation. We also handle interior demolition for hotels, restaurants, shopping malls, supermarkets, schools, recreational venues, and more.
Enforce the engineering supervision system strictly. Before construction, the construction team conducts self-inspection, and after the management department confirms the pass, notify the supervising engineer to inspect and sign off promptly, eliminating hazards and determining the dismantling plan. The project management department has a full-time construction engineer, and the engineering team has part-time construction engineers to ensure that construction activities are always under the strict supervision of a construction engineer. Construction engineers have the right to reject quality issues; if they find deviations from the construction procedures, non-compliance with specifications and technical instructions, or the use of equipment that does not meet quality requirements, they have the authority to halt work, issue stop-work orders if necessary, and impose penalties within a specified period, to prevent quality accidents. While developing the implementable construction plan, detailed quality assurance measures must also be prepared; no construction can commence without quality assurance measures. If the quality assurance system and measures are imperfect or not implemented, work should be halted for rectification until the requirements are met before resuming construction. Enforce construction discipline strictly, control the quality of each process, and ensure that the previous process is qualified before proceeding to the next; otherwise, the quality issues will be the responsibility of the next process's team. Carefully inspect each step of the process flow to ensure construction is standardized and rationalized.































