Changshu Demolition Company undertakes chemical factory relocation and equipment dismantling. Prior to the dismantling construction of a chemical factory, it is essential for both parties to conduct a technical safety briefing for the relevant operation managers based on the characteristics of the construction content. It is mandatory to inspect and confirm the safety reliability of the tools, protective equipment (insulating shoes, insulating gloves, anti-toxic masks, safety helmets, safety belts, safety ropes, etc.) used in the construction work. All operations during the dismantling process must strictly adhere to the operation permit system and corresponding technical safety specifications.
Established in 2006 with approval from the relevant authorities, our company is registered and operates. We currently possess 12 excavators, 10 crane hammers, 5 dump trucks, large transport vehicles, production vehicles, etc., with a total asset of nearly 50 million yuan and a registered capital of 60 million yuan. Specializing in demolition projects, chemical plant dismantling, large equipment recycling, and difficult chimney manual dismantling, we also undertake large-scale decoration and renovation projects. Our company is equipped with advanced and large modern demolition machinery.
Hotel, shopping mall, and guesthouse demolition projects; interior structural dismantling, ceiling removal, cable and wire dismantling, ventilation system removal, partition removal, floor removal, wall and floor breaking, billboard removal, neon sign removal, aluminum alloy window and door removal, etc. Appropriate equipment and solutions are available for buildings of different structures. Rich experience has been accumulated in the dismantling process, ensuring the intact protection of communication lines, power lines, and underground pipelines. Specializes in contracting complex structures and high-difficulty buildings.
































