Jurong Chemical Demolition Company specializes in chemical factory demolition and recycling. Jiangsu Haoren Engineering Co., Ltd. is a professional demolition company that combines manual and mechanical demolition. It is a legally registered company with valid demolition qualifications approved by the national authorities. With years of experience in the demolition industry, we have extensive demolition expertise. Our company excels in comprehensive project contracting for demolition. We have specialized personnel and equipment for the demolition of both internal and external structures, as well as the entire structure. We are responsible for waste removal and cleaning the demolition site. With years of on-site demolition experience, we can handle challenging tasks under various conditions. We have long stood in the Jiangsu market with excellent equipment, specialized technology, perfect service, and fair prices.
Established in 2006 with approval from the relevant authorities, our company is registered and operational. We currently possess 12 excavators, 10 cranes, 5 loaders, large trailers, production vehicles, etc., with a total asset value of nearly 50 million yuan and registered capital of 60 million yuan. Specializing in demolition projects, chemical plant dismantling, large equipment dismantling and recycling, and challenging chimney manual dismantling, we also undertake large-scale decoration and renovation projects. Our company boasts advanced equipment with modern and innovative mechanical demolition capabilities.
Vehicles for waste removal must be parked within the construction closure area; such vehicles should be enclosed or covered with tarpaulins, and there should be a designated person to direct their entry and exit. The operation time for waste removal should adhere to relevant regulations, ensuring no work is conducted at night to minimize noise pollution. When dismantling, it is strictly prohibited to use open flames in the presence of flammable, combustible materials, or insulating materials. A fire lane should be set up at the construction site and kept clear. The roads at the construction site should be kept open in both directions to ensure that fire vehicles can promptly access the incident site for rescue operations.